My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 BKF Sanitary Sewer Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 BKF Sanitary Sewer Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 2:52:50 PM
Creation date
3/25/2022 10:24:31 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Sanitary Sewer Pump Station Design Project
RMP File Number
304
Date
1/20/2022
MO Ref
22-002
Amendment
Yes
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
3/25/2022 10:24 AM
Modified:
3/25/2022 10:24 AM
Text:
https://redwoodcity.na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAa37BxXb5WJrsiC9r95byVEX9Ze4kmPjh
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
3/25/2022 10:24 AM
Modified:
3/25/2022 10:24 AM
Text:
https://na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAa37BxXb5WJrsiC9r95byVEX9Ze4kmPjh
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
3/25/2022 10:24 AM
Modified:
3/25/2022 10:24 AM
Text:
https://redwoodcity.na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAa37BxXb5WJrsiC9r95byVEX9Ze4kmPjh
ID:
4
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
3/25/2022 10:24 AM
Modified:
3/25/2022 10:24 AM
Text:
https://redwoodcity.na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAa37BxXb5WJrsiC9r95byVEX9Ze4kmPjh
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 12-22-21 JB <br />CITY:City of Redwood City, <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br />By: _____________________________ <br /> Melissa Stevenson Diaz, City Manager <br />ATTEST: <br />____________________________ <br />Pamela Aguilar, City Clerk <br />CONSULTANT:BKF Engineers <br />255 Shoreline Drive, Suite 200 <br />Redwood City, CA 94065 <br />*By: _________________________ **By: __________________________ <br />Printed Name: __________________ Printed Name: __________________ <br />Title: __________________________ Title: __________________________ <br />If required by City, proper notarial acknowledgment of execution by Consultant must be attached. If a Corporation, <br />Agreement must be signed by one corporate officer from each of the following two groups. <br />*Group A.**Group B. <br /> Chairman, Secretary, <br /> President, or Assistant Secretary, <br /> Vice-President CFO or Assistant Treasurer <br />Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate <br />seal empowering the officer(s) signing to bind the corporation. <br />ATTY/AGR.2021.331/BKF Engineers (Sanitary Sewer Pump Station No. 8 and No. 9 Design) (Page 10 of 23) <br />Brian Scott (Jan 5, 2022 16:50 PST) <br />Brian Scott <br />Principal/Vice President <br />Brian Scott <br />CFO <br />Jean Chen
The URL can be used to link to this page
Your browser does not support the video tag.