My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Dewey Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 Dewey Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:19:17 PM
Creation date
7/19/2022 4:27:17 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Dewey Services, Inc.
PROJECT NAME
Vector Control Services
RMP File Number
304.5
Date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 05-31-22 MI <br />Cordilleras Creek 20 June (installation), July, <br />August, September, October <br />(removal) <br />Docktown 11 June (installation), July, <br />August, September, October <br />(removal) <br />Garrett Park 17 June (installation), July, <br />August, September, October <br />(removal) <br />Little River Creek 12 June (installation), July, <br />August, September, October <br />(removal) <br />Port of Redwood City 30 Every two months (Jan - Dec) <br />Redwood City Marina 36 Every two months (Jan – Dec) <br />Redwood Creek 62 June (installation), July, <br />August, September, October <br />(removal) <br />Redwood Creek (Farm Hill <br />Apts) <br />41 June (installation), July, <br />August, September, October <br />(removal) <br />Contractor will conduct follow-up inspections at the above intervals to replace as <br />necessary consumed or deteriorated bait and to correct any deficiencies concerning <br />the bait stations. <br />For bait stations along Cordilleras Creek, Contractor will remove all installed bait stations <br />thirty <br />(30)days after final inspection and obliterate the colored dots marking location of the <br />bait stations. <br />All tools, labor, materials and equipment necessary to carry out this program are to be <br />provided by the Contractor. No alteration or substitution of materials is permissible <br />without the express written authority of SMCMVCD. <br />Rodenticide: Bromadiolone, diphacinone or bromethalin shall serve as the <br />rodenticide. The rodenticide shall be used in the form of a paraffin bait block, <br />of the type manufactured by Bell Laboratories. Bait blocks shall consist of <br />one (1) eight- ounce (8 oz.) bait block and shall contain 0.005 percent <br />(0.005%) bromadiolone per unit weight. Rodenticide may be changed by the <br />SMCMVCD at any time depending on activity and location of bait. Notice will <br />be given to Contractor in a reasonable amount of time specifying which bait <br />and area needs to be changed. <br />ATTY/AGR.2022.127/Vector Pest Control (Dewey Services, Inc.) (Page 19 of 24)
The URL can be used to link to this page
Your browser does not support the video tag.