Laserfiche WebLink
REV: 05-31-22 MI <br />from children. Under no circumstances shall bait stations be installed or <br />placed in areas where children are known to play. In areas where it is <br />obvious that children do not play, the bait stations must still be adequately <br />concealed so as not to be conspicuous to the ordinary child. Contractor <br />will not deface private improvements and will be required to exercise his/her <br />judgment in a prudent manner regarding the location of bait stations, etc. <br />The bait block with the “Caution” tag must be secured to the stake through <br />a hole made in the center of the end cap of the bait container and then <br />placed into this excavation and secured into the ground by the stake at the <br />rear of the excavation. The open end of the container should face out and <br />slightly downward. The tie-wire should be drawn tight, bringing the station to <br />rest against the stake. The installation shall be completed by covering and <br />tightly packing the station with earth so that only about one (1) to three (3) <br />inches of the reduced open end of the container remains exposed. <br />The approximate location of each bait station shall be marked in the field by <br />the contractor by painting a red colored dot approximately one (1) to two (2) <br />inches in diameter on some plainly visible object such as a stone, boulder <br />or tree. The painted dot shall be situated approximately ten (10) feet away <br />from the bait station so as to designate its general but not specific location. <br />One dot if the bait station is located on the same side or two dots if the bait <br />station is located on the opposite creek bank. <br />Any bait containers overlooked and not removed the previous year shall be <br />removed by the Contractor at the time of installation at no cost to the City. <br />Bait Inspection, Replacement, Reinstallation and Removal: Inspections <br />along the creek shall be made at thirty (30) day intervals to determine the <br />condition of the bait and to service and maintain the bait as required. The <br />Contractor should be guided in their performance so as not to exceed the <br />parameters set out in Exhibit <br />Contractor will not be paid for unauthorized work performed. <br />Bait containers found to be inadequately secured, positioned, marked or <br />concealed shall be corrected by Contractor in conjunction with making the <br />inspection. The correction shall be included in the inspection charge. An <br />inspection fee shall be allowed for each bait station location inspected and <br />will include making the aforesaid corrections. <br />A red colored dot is to be used at the time of installation. At each subsequent <br />inspection, a different colored enamel paint must be applied over the <br />preexisting markings as follows: <br />ATTY/AGR.2022.127/Vector Pest Control (Dewey Services, Inc.) (Page 21 of 24)