Laserfiche WebLink
REV: 05-31-22 MI <br />Installation June Red <br />First Inspection July Yellow <br />Second Inspection August Green <br />Third Inspection Sept White <br />Removal October N/A <br />Once a colored dot is located (at time of installation) the same location shall <br />be used for each subsequent inspection by affixing the appropriate color <br />over the preexisting dot. At no time should the colored dot be greater than <br />two (2) inches in diameter. If during an inspection conditions of the creek, <br />levee or shoreline have changed and Contractor believes the relocation of <br />the bait station is advisable, he/she may do so and must within two (2) days <br />inform the Assistant Manager of the change in location. The Contractor will, <br />however, make the relocation and obliterate the dot marking of the old <br />location of the bait station at no additional cost to the City. <br />Bait replacement shall be made to all bait blocks which are found to be <br />consumed or deteriorated at the equivalent of one-half (1/2) or more of their <br />original weight. Bait which is judged to be no longer palatable to rodents <br />shall also be replaced. A separate charge will be allowed in addition to the <br />inspection for each bait block replacement. <br />Bait blocks and containers found to be missing shall be reinstalled and a <br />separate charge made for each reinstallation. Contractor is again advised <br />not to exceed the parameters set out in Exhibit A. Contractor will not be paid <br />for unauthorized work performed. If City and/or SMCMVCD desires <br />additional work to be performed by Contractor, City and/or SMCMVCD will <br />request such additional work by writing. Old bait taken from bait containers <br />shall be removed from the treatment area by the Contractor and disposed <br />of in a manner consistent with instructions on the label and in accordance <br />with state and local regulations. <br />Thirty (30) days after final inspection, Contractor will remove all bait stations <br />along Cordilleras Creek and obliterate all colored dots marking location of <br />the bait stations. Contractor shall not bill City for this work. <br />Key and Color Code to be Used on Record of Work: The following symbols <br />shall be used to record the above items on the special map provided. This <br />information is essential and must be recorded by the individual who <br />performs the work at the time the work is performed. <br />ATTY/AGR.2022.127/Vector Pest Control (Dewey Services, Inc.) (Page 22 of 24)