My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 RRM Design Group
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 RRM Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:51:42 PM
Creation date
8/31/2022 3:50:35 PM
Metadata
Fields
Template:
Agreement
Contractor Name
RRM Design Group
PROJECT NAME
Landscape architectural firm
RMP File Number
304
Date
9/30/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT 1 <br />Task E: Environmental Analysis- CEQA Document (IS/MND)-Lot A <br />Subtask E.1: Project Start-up <br />Project start-up includes overall project initiation activities. Subconsultant will prepare a <br />schedule, a data request, review the Study and the Initial Study for the Roselli Park <br />expansion among other relevant documents. Subconsultant's Environmental Planning <br />staff will review relevant documentation and undertake preliminary research related to the <br />proposed project and surrounding areas. Subconsultant will participate in a one -day <br />project kick-off meeting and site visit. At the meeting Subconsultant will: 1) collect relevant <br />reports and drawings; 2) verify the key components the park project and trails program; <br />3) confirm schedules and design strategies at each site; 4) identify other key contacts and <br />stakeholders; and 5) discuss overall project data needs and communication protocols. <br />Subconsultant will report on the meeting and retain site photos for use in the CEQA <br />process. <br />Deliverables: <br />■ Prepare an agenda and preliminary schedule for a kickoff meeting <br />■ Review relevant documentation and commence research <br />■ Prepare meeting report, revised schedule, and data request <br />Subtask E.2: Environmental Constraints Analysis <br />Subconsultant will provide environmental constraints evaluations of design concepts <br />Consultant produces the Roselli Park expansion into Lot A. The site is relatively <br />constrained, and the primary environmental constraints will be addressed in three <br />technical memos (described below), an arborist report, a parking and traffic Scope of <br />Work and Estimated Cost WRA Inc., June 3, 2021 Redwood City Parks and Trails CEQA <br />Services Project #30028 4 report, and a cultural resources report that addresses the <br />National Historic Preservation Act protections placed on the current Library. <br />Preliminary cultural resources evaluations will include CHRIS records searches, <br />resources that are 45 years or older that might be affected by the projects, and whether <br />any tribes expressed an interest with the City in consulting under AB -52 about the project. <br />These searches and potential results will become part of the CEQA documentation. <br />Deliverables: <br />■ GIS Environmental Constraints Analyses considering biological and cultural resources, and flood <br />hazards. <br />■ Review conceptual designs and make recommendations to avoid, minimize or mitigate potential <br />environmental issues. <br />■ Document alternatives considered in a technical memorandum. <br />Subtask E3: CEQA Level Project Description <br />REV: 08-04-2021 RL <br />ATTY/AGR.2021 207/RRM (Downtown Parks and Bay Connectivity Project) (Page 26 of 32) <br />
The URL can be used to link to this page
Your browser does not support the video tag.