REV: 11-09-23 VR <br />BABA will eventually require all iron, steel, manufactured products, and all raw materials <br />used in construction to be produced in the U.S. Currently only applicable to iron & steel. <br />Covered infrastructure: defined as building & real property (including housing), utilities, <br />water systems, electrical transmission facilities & systems, broadband, and transportation. <br />The design team is to ensure that any items containing iron or steel specified for the project <br />meet this requirement and applicable documentation is available. The Consultant team will <br />track all iron/steel items and their manufacturing information as part of the project scope. <br />Assumptions / Limitations: <br />In the event that unusual soil conditions such as expansive soils, fill soils, soils with low <br />bearing capacity (under 2,000 psf), and high-water tables which require additional <br />engineering are encountered, AQUATICS SUB-CONSULTANT will need to request an <br />additional service to be processed. This includes piles, piers, and/or mat slabs, and <br />dewatering systems etc. <br />AQUATICS SUB-CONSULTANT’s scope of work assumes that the architectural / structural <br />design of the splash pad’s wet play equipment, including engineered shop drawings are to <br />be furnished by specialty vendors (AQUATICS SUB-CONSULTANT will coordinate this effort <br />as part of their contracted scope). <br />Excludes arborist services / tree removal recommendations. <br />Excludes preparation of 3D renderings or other presentation graphics. <br />Excludes preparation of certificates of completion – this is to be completed by the general <br />contractor or City upon project acceptance and completion. <br />Excludes miscellaneous plan check/ permit fees / inspection or other fees as may be <br />required by DSA /other regulatory agencies. <br />Assumes new irrigation can be connected to existing park irrigation system, with regards to <br />mainlines. <br />Lateral lines not to be reused except in RWC approved cases (after review by City’s irrigation <br />tech). <br />Excludes additional design options or incorporating additional rounds of comments, beyond <br />what is listed in this proposal. <br />4) Compensation: <br />Consultant will be paid monthly pursuant to invoices consistent with Section 6, Compensation, <br />for each task as identified below: <br />Task Description of Task and Payment Terms Amount <br />Task <br />1 <br />Design Development Phase – Landscape Architecture and Civil Engineering, <br />Consultant to be compensated on an hourly basis for a not to exceed amount of: <br />$63,100 <br />Task <br />2 <br />Construction Documents (50%, 90% and 100% PS&E) – Landscape Architecture <br />and Civil Engineering, Consultant to be compensated on an hourly basis for a not <br />to exceed amount of: <br />$174,850 <br />Task <br />3 <br />SWPPP (Stormwater Pollution Prevention Plan), Consultant to be compensated <br />upon City’s acceptance of deliverable in a lump sum basis of: <br />$4,000 <br />Task <br />4 <br />Aquatic Design Scope of Work (50%, 90% and 100% PS&E) <br />Consultant to be compensated on an hourly basis for a not to exceed amount of: <br />$78,650 <br />ATTY/AGR.2023/Amend. No.1/O'Dell Engineering (Hoover Park Renovation - Design and Management) (Page 12 of 15)