My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Regenesis Bioremediation Products
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 Regenesis Bioremediation Products
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 2:01:23 PM
Creation date
12/16/2022 2:01:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Regenesis Bioremediation Products
PROJECT NAME
Remediation of groundwater at Sequoia Station
RMP File Number
304
Date
11/23/2022
MO Ref
22-197
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 10-05-2022 VR <br />III. FEE SCHEDULE AND PAYMENT TERMS <br />All necessary taxes, delivery/shipping, labor, fuel/gas, equipment, materials, insurances, <br />transportation, travel, vehicles, tools, accommodations, wet weather and noise mitigation items, <br />personnel, disposal services, and any other charges required to complete the tasks outlined in <br />this Agreement are included in the prices below. Consultant shall be compensated on a per task <br />per the fee schedule below. Consultant shall include on the monthly invoice information as <br />described in Section 6 of this Agreement. The City shall be billed only for completed project tasks, <br />except for Task 1, which may be billed upon completed subtask, Task 1.4, which may be billed <br />upon completion of area as delineated, and Tasks 2, 3 and 4, which may be billed monthly and <br />on a percent complete basis calculated by pounds of product injected divided by total pounds of <br />product to be injected. Payment will be made within thirty days of receipt of an accurate invoice. <br />#Task Price <br />1 Pre-Injection Activities <br />1.1 Health & Safety Plan and Safety Meetings $2,150.00 <br />1.2 Preconstruction Kickoff Meeting $750.00 <br />1.3 Site Security, Traffic Control Measures, and <br />Temporary No Parking Zones <br />$11,950.00 <br />1.4 Utility Clearance <br />PRB and “D” Wells Area $25,810.00 <br />“E” Wells Area $12,890.00 <br />1.5 Spill Contingency Plan $850.00 <br />1.6 Mobilization $11,200.00 <br />2 PRB Emplacement Area $92,994.00 <br />3 “D” Wells Area <br />3.1 ZVI/EVO mix $212,905.48 <br />3.2 EVO Only $470,281.68 <br />4 “E” Wells Area $118,905.84 <br />5 Site Restoration $6,125.00 <br />6 Demobilization and Waste Management $11,200.00 <br />7 Consultant’s Report $3,995.00 <br />Total Project Price $982,007.00 <br />Consultant shall inform the Public Works Director or designee prior to any out-of-scope work being <br />performed. No out-of-scope work shall be undertaken without review and written approval from <br />the Public Works Director or designee. A contingency amount not to exceed $98,200 shall be <br />available for any out-of-scope work necessary to complete this project and per the rate schedules <br />below. <br />Unit Cost Additions <br />Description Rate <br />Drill Rig, Operator, Assistant (including supplies)$475 per hour <br />Upgrade to Level C PPE $125 per day <br />Injection Point (each, labor only)$1,500 per each <br />Zero Valent Iron (ZVI)$92 per 100 pounds <br />Emulsified Zero Valent Iron (ZVI/EVO) mixture $2,172 per 100 gallons <br />Emulsified Vegetable Oil (EVO)$2,080 per 100 gallons <br />ATTY/AGR.2022.348/Regenesis Bioremediation Products (Page 24 of 34)
The URL can be used to link to this page
Your browser does not support the video tag.