Laserfiche WebLink
3.6. all other work, improvements, or construction required by or specified <br />in the abovementioned plans and specifications, conditions of permits <br />and all construction, appurtenances and improvements necessary as <br />reasonably determined by the City Engineer to complete the <br />aforementioned improvements, both within and outside of the Property. <br />The construction, installation and completion of the Improvements and all labor and <br />materials furnished in connection therewith are hereinafter referred to collectively as the <br />"Work." The Work and Improvements will be in strict compliance with the provisions of <br />City of Redwood City Engineering Standards and Specifications. In the event a conflict <br />exists between the Improvement Plans and the requirements of City of Redwood City <br />Engineering Standards and Specifications, the stricter requirement or standard will <br />govern, as determined by the City Engineer. <br />4. Completion Date. Developer will complete the Work within five years of the <br />Effective Date. All Work will be completed in a good and workmanlike manner in <br />accordance with accepted design and construction practices and consistent with the <br />Improvement Plans. This completion date may be extended by the City Engineer in their <br />sole and absolute discretion at the request of Developer, which request will be <br />accompanied by a written assurance acceptable to the City Engineer that the securities <br />required by Section 13 will remain enforceable throughout the term of the extension. <br />5. Estimated Cost of Work. The engineer's estimated cost of the Work is one <br />hundred seventeen thousand seven hundred sixty two Dollars ($117,762.00) ("Estimated <br />Cost of Work"). <br />6. Modifications to the Plans. Approval of this Agreement by City does not <br />release Developer from its responsibility to correct mistakes, errors or omissions in the <br />Improvement Plans. If, at any time, in the opinion of the City Engineer, in their reasonable <br />discretion, the Improvement Plans are deemed inadequate in any respect, Developer <br />agrees to make such modifications, changes or revisions as necessary in order to <br />complete the Work in a good and workmanlike manner in accordance with accepted <br />design and construction standards and consistent with the Conditions, Improvement <br />Plans and the Green Infrastructure Development Standards and the City's Code. <br />7. Repairs. Developer will either (a) repair or have repaired in a timely manner <br />at its sole cost and expense all public roads, streets, or other public or private property <br />damaged as a result of or incidental to the Work or in connection with the development <br />of the Property, or (b) pay to the property owner of any damaged road, street or property <br />the full cost of such repair. In addition, Developer will obtain the written acceptance of <br />such repair or payment from any owner whose private or public property was repaired by <br />Developer or to whom Developer has paid the full cost of such repair in accordance with <br />this Section 7. . <br />8. Foreman or Superintendent. A competent foreman or superintendent, <br />satisfactory to the City Engineer in their reasonable discretion, with authority to act for <br />and on behalf of Developer, will be named in writing by Developer prior to commencement <br />REV: 09-23-22 A <br />ATTY/AGR.2022.359/PBA II, LLC (242 Walnut Street) (Page 3 of 15) <br />