My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 Verde Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 Verde Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:23:23 PM
Creation date
5/26/2023 10:50:28 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
- On-call Design Services
RMP File Number
304
Date
5/18/2023
MO Ref
23-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 03-10-23 JB <br />e. Conduct site visits during construction at appropriate stages, amount <br />of visits approved by City. <br />f. Attend, participate and review project at the pre-construction <br />meeting. <br />g. Review shop drawings submittals, change order requests, requests <br />for information, and provide written recommendations to the City. <br />h. Participate in the final inspection and assist with punch list of <br />deficiencies. <br />i. Prepare “As-Built” drawings based on construction field notes and <br />limited field review by the Consultant. <br />j. Deliverables: <br />k. Consultant shall furnish one (1) set of full-size plans. Provide digital <br />copies of final specifications, cost estimate and plans in native format <br />(Word, Excel and AutoCAD) <br />B.Construction Management <br />a)Provide a high-level of communication with the City’s project manager and <br />updated work schedules on a biweekly basis; <br />b)Monitor and assess project budgets and cost controls; <br />c)Coordinate with design staff as required; <br />d)Conduct regular meetings with contractor to discuss job-site issues, <br />coordination, project budget, and project schedule; <br />e)Notify City’s project manager of any potential problems and conditions which <br />could result in delays and/or change order requests; <br />f)Administer project including processing and reviewing RFIs, submittals, <br />potential change orders, progress payments and potential claims. Review and <br />make recommendations to City’s project manager regarding change order <br />requests, negotiate contract change orders, and related correspondence; <br />g)Answer calls and emails from the public and respond within 24 hours; respond <br />in writing within 3 working days to letters received from the public; <br />h)Ensure appropriate communication between contractor and the public; <br />i)Maintain project files and records and deliver them to City’s project manager <br />upon completion of the project; <br />j)Review contractor progress payment requests; <br />k)Perform a final review of the work with the City and compile a punch list for the <br />contractor; <br />l)Review final quantities and payments and obtain redline as-built plans from the <br />contractor; <br />m)Follow all applicable requirements for projects with state and federal funding, <br />as outlined in the most recent version of the Caltrans Local Assistance <br />Procedures Manual. <br />ATTY/AGR.2023.041/Verde Design (Oncall Services) (Page 15 of 17)
The URL can be used to link to this page
Your browser does not support the video tag.