Laserfiche WebLink
<br />ATTY/AGR/SETTLEMENTS/2023/SETTLEMENT AGREEMENT - 557 E. BAYSHORE ROAD <br />REV: 05-17-23 JB <br />#216638140_v1 50 <br />i. Multi-Family – per unit $407.64 + 27.37 <br />per unit <br />ii. Commercial – per 1,000 sq. ft. $407.64 + 37.50 <br />per 1,000 sq. ft. <br />*City may deem Temporary Certificate of Occupancy Deposits forfeited if <br />project is not completed within designated timeframe. <br />D. Electrical Permit Fees <br />4. Temporary Power Service Permit $375.30 <br />E. Miscellaneous Fees <br />9. Photovoltaic Solar Systems <br />a. Residential solar system 15 kW or less $493.37 <br />b. Residential solar system 16 kW or more $493.00 + $17 per <br />kW <br />c. Commercial solar system 50 kW or less $1,243.96 <br />d. Commercial solar system 51 to 250 kW $1,244 + $7 per <br />kW <br />e. Commercial solar system 251 kW or more $1,244 + $5 per <br />kW <br />10. Construction and Demolition Debris <br />a. Deposit Minimum deposit <br />of $500.00 or <br />$50.00 per ton, <br />whichever is <br />greater <br />b. Administrative Fee $185.54 <br />11. Appeal for Alternative Methods & Materials <br />a. Administrative Appeal (written) $421.68 <br />b. Appeal to Board of Appeals (appeal to ruling by <br />Fire/Building Code Official) <br />See Fire <br />Department’s Fee <br />Schedule <br /> <br />Engineering and Transportation <br /> <br />Services Fees/Deposits <br />D. Deposit for Engineering Services/Permits <br />1. Deposit Schedule* for Engineering Services and Permits <br />a. General Engineering Services – <br />Preliminary Plan Review, Concept Study, <br />Water Availability, etc. <br />Deposit $800.00 minimum <br />c. Review of Final Parcel Map or <br />Financial Subdivision Map <br />Deposit $800.00 minimum <br />2. Deposit Schedule* for Encroachment Permits or Subdivision Plan Review <br />Estimated Cost of Improvements (ECI) <br />$3,000,001 and above Deposit $68,000 + 2% of <br />ECI