Laserfiche WebLink
SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. <br />Bid items are described in Section 01 1100 (Summary of Work). Quote in figures only, unless <br />words are specifically requested. <br />Item <br />Description <br />Estimated <br />Unit <br />Total Item Cost <br />Quantity <br />Unit Price <br />Bonding and <br />1 <br />LS <br />$ <br />$ <br />1 <br />mobilization <br />130,000 <br />130, oco <br />Construction staking <br />1 <br />LS <br />$ <br />$ <br />2 <br />10,o00 <br />100006 <br />Traffic control <br />1 <br />LS <br />$ <br />$ <br />3 <br />y61168 <br />q6j -166 <br />Tree protection <br />1 <br />ALLOW <br />$10,000.00 <br />$10,000.00 <br />4 <br />Demolition -Clear <br />3,260 <br />SF <br />$ <br />$ <br />5 <br />and Grub <br />5 <br />16,300 <br />Tree removal <br />8 <br />EA <br />$ 11 900 <br />$15,2.00 <br />6 <br />7 <br />Demolition -Concrete <br />21,000 <br />SF <br />$ <br />$ 294100 <br />pavement <br />4 `� <br />8 <br />Demolition -Concrete <br />3,545 <br />LF <br />$ <br />curb and gutter <br />9 <br />Curb inlet <br />1 <br />EA <br />$ q1 G0 6 <br />$ ,0 <br />10 <br />Stormdrain pipe, 12" <br />45 <br />LF <br />$ o <br />$ 22, d <br />RCP <br />11 <br />Utility box <br />24 <br />EA <br />$ <br />$ 31880 <br />replacement <br />37 0 <br />12 <br />Concrete sidewalk <br />17,500 <br />SF <br />$ I <br />$ 2-451000 <br />13 <br />Concrete curb and <br />3,545 <br />LF <br />$ 50 <br />$ I'l i, 250 <br />gutter <br />14 <br />Concrete curb ramp <br />2 <br />EA <br />$ <br />$ <br />type <br />$11,00 <br />16, `f 00 <br />BID FORM 004113-2 <br />REDWOOD AVENUE SIDEWALK CURB AND GUTTER IMPROVEMENT PROJECT <br />