Laserfiche WebLink
REV: 04-07-2023 MI <br />7.2.3 Enhancement of the UI to ensure that users know how and what the <br />download button does. <br />7.2.4 Projects shall be sorted by “Status.” <br />7.2.5 On Main Page add Instruction text for the end user on how to use this <br />page. <br />7.2.5.1 Instructions. It’s not intuitive what to do once you get to this <br />page. Add space so City can add instructions. Exact wording TBD. <br />7.3Manage Projects <br />7.3.1 Initially, projects that have estimated funding for the current year (this <br />would have been entered the prior FY), it should show up on this list. <br />Modify this so if a user wanted to, they will be able to remove projects <br />from this list so it no longer shows up here. It does not show on <br />REPORTS, but they could always go back to “Choose from Active <br />projects” to move it back to this Home Page list. <br />8. Staff App - Enhancements for Project Page 1 of 3 <br />Today the application tracks projects completion date with a specific end date. <br />However, some projects do not have an estimated completion date or estimated <br />useful life at the time of request and require the ability to state “TBD” <br />8.1.Estimated Completion Date. <br />8.1.1 Add the option for users to choose “TBD” instead of a specific date. <br />This will grey out the Date field when selected and cause reports to <br />show TBD. <br />8.1.2 Change the Date field to an Option set of Fiscal years. <br />ATTY/AGR.2023.075/CodeRight Inc. (CIP App) (Page 15 of 20)