Laserfiche WebLink
ATTY/RESO.0034/PC RESO RECOMMENDING CEQA APPROVAL – 505 E. BAYSHORE – EXHIBIT A <br />REV: 05-12-23 JB <br />Page 10 of 30 <br />public use airport. The project would not result in a safety hazard or excessive noise <br />for people residing or working in the project area. <br /> <br />Impact HAZ-6: The Project would not impair implementation of or physically <br />interfere with an adopted emergency response plan or emergency evacuation plan. <br /> <br />Impact HAZ-7: The Project would not expose people or structures, either directly <br />or indirectly, to a significant risk of loss, injury, or death involving wildland fires. <br /> <br />10. Hydrology and Water Quality. These findings regarding the Project’s potential impacts <br />relating to hydrology and water quality are based on the analyses on pages 140 to 148 of <br />the DEIR, which are hereby incorporated herein in its entirety. <br /> <br />Impact HYD-1: The Project would not violate any water quality standards or waste <br />discharge requirements or otherwise substantially degrade surface or ground water <br />quality. <br /> <br />Impact HYD-2: The Project would not substantially decrease groundwater <br />supplies or interfere substantially with groundwater recharge such that the Project <br />may impede sustainable groundwater management of the basin. <br /> <br />Impact HYD-3: The Project would not substantially alter the existing drainage <br />pattern of the site or area, including through the alteration of the course of a stream <br />or river or through the addition of impervious surfaces, in a manner which would <br />result in substantial erosion or siltation on- or off-site; substantially increase the <br />rate or amount of surface runoff in a manner which would result in flooding on- or <br />off-site; create or contribute runoff water which would exceed the capacity of <br />existing or planned stormwater drainage systems or provide substantial additional <br />sources of polluted runoff; or impede or redirect flood flows. <br /> <br />Impact HYD-4: The Project would not risk release of pollutants due to project <br />inundation in flood hazard, tsunami, or seiche zones. <br /> <br />Impact HYD-5: The Project would not conflict with or obstruct implementation of <br />a water quality control plan or sustainable groundwater management plan. <br /> <br />Impact HYD-C: The Project would not result in a cumulatively considerable <br />contribution to a significant hydrology and water quality impact.