Laserfiche WebLink
ATTY/RESO.0035/PC RESO RECOMMENDING GENERAL PLAN AMENDMENT APPROVAL - 505 E. BAYSHORE <br />REV: 05-12-23 JB <br />Page 7 of 32 <br />34. Encroachment Permits – Obtain an Encroachment Permit from the Engineering and <br />Transportation Division for work listed below. This permit shall be obtained prior to the <br />commencement of construction of the road, utilities, or any site improvements. <br />[SDR][ENGINEERING] <br />a. Work in the City public right-of-way, easements or property in which the City holds an <br />interest. <br />b. Work requiring a grading permit. Grading permits require a Plot and Finished Grading <br />Plan prepared by a California-registered Civil Engineer. <br />c. Work requiring on-site shoring which affects the public right of way. <br />d. Work using the public right-of-way for any fixed structure (awnings, roof overhangs, fixed <br />planters, etc.). Insurance, meeting the City’s standards, is required. This permit will be <br />recorded against the property. <br /> <br />35. Undergrounding Utilities - The applicant shall underground all overhead utilities within the <br />project site, which shall be shown on the building permit plans. [SDR][ENGINEERING] <br /> <br />36. Sewer Capacity – Prior to encroachment permit issuance, submit to the City, and obtain <br />approval of, an evaluation and report prepared by a licensed engineer demonstrating that the <br />existing sewer mains have sufficient capacity for the project. The study shall consider existing, <br />project, other approved projects, and applications currently under review at time of approval <br />in determining the needed capacity. If the existing sewer main is less than 6” in size, or is in <br />any other way not sufficient as determined by the City Engineer, applicant shall, as part of the <br />Project, construct and install new sewer mains sufficient to meet such requirements, in <br />accordance with the City's Engineering standards and as directed by the City Engineer to the <br />City Engineer's satisfaction. [SDR][ENGINEERING] <br /> <br />37. Sewer Lateral Limit – The project is limited to one sewer lateral. [COA][ENGINEERING] <br /> <br />38. Water Mains – Prior to issuance of any certificate of occupancy for the project, the applicant <br />shall construct the 12” (inner diameter) HDPE water main on East Bayshore Boulevard from <br />project frontage to the nearest water main of 16” inner diameter or larger. <br />[SDR][ENGINEERING] <br /> <br />39. Water Meters – The project is limited to one “master” water meter for domestic and recycled <br />water service. Any metering for individual units must be accomplished by private sub-meters <br />within the property. [COA][ENGINEERING] <br /> <br />40. Submetering – Pursuant to Section 38.5 of the Municipal Code, all newly constructed <br />residential buildings where one meter (master meter) is furnished by the City for more than one <br />residential dwelling unit, separate meter(s) for each distinct dwelling unit downstream of the <br />City water meter shall be installed. The maintenance and billing for water use of submeters <br />shall be the responsibility of the property owner. [SDR][ENGINEERING]