My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 San Francisco City and County of Water Sales Agreement
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 San Francisco City and County of Water Sales Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 3:35:04 PM
Creation date
10/29/2009 12:43:36 PM
Metadata
Fields
Template:
Agreement
Contractor Name
San Francisco, City and County of
PROJECT NAME
Water Sales Agreement
RMP File Number
304
Date
7/1/2009
Reso Ref
14949, 15255
Amendment
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Location of Meters/Gauges <br /> <br />The SFPUC presently maintains meters and gauges that have been used to determine the <br /> <br /> <br />proportionate usage of the Regional Water System, in accordance with the methods and <br /> <br /> <br />calculations described in Exhibit J to the 1984 contract between San Francisco and the <br /> <br /> <br />Wholesale Customers. These meters consist of "County-Line Meters," "In'-City Terminal <br /> <br /> <br />Reservoir Meters" and "System Input and In-line Meters" as described in the following <br /> <br /> <br />subsections. As new capital improvement projects are designed and constructed by the SFPUC, <br /> <br /> <br />it may be necessary for new meters to be installed to ensure continued accurate determinations of <br /> <br /> <br />the proportionate usage of the Regional Water System. "Planned meters" are included in the <br /> <br /> <br />following subs~ctions where planned capital improvement projects are likely to require the <br /> <br /> <br />installation of additional meters. <br /> <br />a. County-line Meters <br /> <br />The SFPUC presently maintains meters at or near the San Mateo-San FranciscoCounty <br />line to measure flow through all transmission pipelines entering the City ("County-line Meters"). <br />The existing and planned County-line Meters are listed in Table 2 and shown on Figures I and 2. <br />Additional details pertaining to the County-line meters located at the Lake Merced Pump Station, <br />and specifically to water deliveries from the pump station to Sunset Reservoir, Sutro Reservoir, <br />and Lake Merced are provided below. <br /> <br />(1) County-Line deliveries to Sunset and Sutro Reservoirs <br /> <br /> <br />Water delivered to the City through the Sunset Supply Pipeline may be pumped from <br /> <br /> <br />the Lake Merced Pump Station to either Sunset Reservoir or Sutro Reservoir located <br /> <br /> <br />within the City. When water is pumped from the Lake Merced Pump Station to both <br /> <br /> <br />Sunset and Sutro reservoirs simultaneously, the recording instrumentation on the <br /> <br /> <br />Sunset and Sutro venturi meters are designed to record flows through both meters. <br /> <br /> <br />When water is pumped to SutfO Reservoir only (typically utilizing Pump No.4 at the <br /> <br />3 <br /> <br />March] 1,2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.