My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 San Francisco City and County of Water Sales Agreement
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 San Francisco City and County of Water Sales Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 3:35:04 PM
Creation date
10/29/2009 12:43:36 PM
Metadata
Fields
Template:
Agreement
Contractor Name
San Francisco, City and County of
PROJECT NAME
Water Sales Agreement
RMP File Number
304
Date
7/1/2009
Reso Ref
14949, 15255
Amendment
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />2 <br /> <br />15048734.1 <br />In 2018, the parties agreed to classify certain capital projects (but not the underlying asset <br />classifications shown on Attachment R-3) for a select number of Hetch Hetchy Enterprise <br />Existing System Assets. These projects are defined below. These project-related classification <br />changes, shown on this Attachment R-2, are part of the 2018 amendments to the Agreement <br />and are not precedential for any other asset-related capital cost or operating expense. <br />The capital costs for the projects defined below shall be allocated in accordance with the project <br />classifications shown on this Attachment R-2 so long as the projects are approved by the <br />SFPUC following necessary CEQA review. Once the project, as defined below, is complete and <br />the Commission adopts a project administrative closeout resolution authorizing final payment to <br />the contractor(s), the separate project classification expires and all subsequent capital costs and <br />operating expenses related to the asset will follow the existing asset classification shown on <br />Attachment R-3. The project classification exceptions will expire on June 30, 2034 and all future <br />capital and operating costs and expenses will follow the asset classification, even if a project <br />has not been completed by the SFPUC by that date. <br />Unless specified otherwise, the capital costs for each project specified below includes costs <br />incurred by the SFPUC for the construction of the project using debt or revenue funding, along <br />with all project-related planning costs, engineering costs, engineering services, costs to obtain <br />project-related regulatory permits, fees for environmental consultants, mitigation costs, legal <br />fees, and other costs that are required to construct and place the project in operation as a water <br />conveyance or power generation facility, or to serve both functions. The allocation of project <br />capital costs includes expenditures incurred in fiscal years prior to FY 2018-19 where noted. <br />Project Classification Descriptions6 <br />1. Lower Cherry Aqueduct Project means repairs along the Lower Cherry Aqueduct system <br />from and including the Cherry Creek Diversion Dam downstream to and including a <br />connection to the pool behind Early Intake Dam, including expenditures incurred in FY 2013- <br />14 and subsequent fiscal years until the project is complete. <br />2. Mountain Tunnel Interim Work means the investigations, interim repairs to the tunnel as <br />well as improvements to access roads and adits for Adit 5/6 and Adit 8/9 already funded or <br />included in the FY 2017-18 ten-year CIP, including expenditures incurred in FY 2011-12 and <br />subsequent fiscal years until the project is complete. <br />3. Mountain Tunnel Long Term Repairs means repair or replacement of tunnel lining not <br />performed as part of the Mountain Tunnel Interim Work, contact grouting of the entire tunnel <br />lining, completion of hydraulic improvements, installation of steel lining in sections of the <br />tunnel to accommodate increased pressure, extension of the siphon crossing under the <br />South Fork of the Tuolumne River, an enlarged concrete portal and bulkhead at Early <br />Intake, and roadway access improvements to tunnel entry points at the South Fork <br />Tuolumne River crossing, Adit 8-9 and Adit 5-6. Project capital costs include costs incurred <br />in FY 2011-12 and subsequent fiscal years until the project is complete. <br /> <br />6 SFPUC and BAWSCA discussed and agreed to omit the following projects from this special <br />project classification: 1) Early Intake Diversion Dam and Reservoir, 2) Moccasin Power Tunnel, <br />and 3) Kirkwood Generator Bypass and Moccasin Generator #1 & 2 Bypasses. All capital costs <br />and operating expenses related to these assets will follow the existing asset classification <br />shown on Attachment R-3.
The URL can be used to link to this page
Your browser does not support the video tag.