Laserfiche WebLink
<br /> <br /> <br />3 <br /> <br />15048734.1 <br />4. Mountain Tunnel Flow Control Facility (FCF) Project means construction of a FCF at the <br />downstream end of Mountain Tunnel to reduce lining damage by eliminating the daily <br />cycling between open channel and pressurized flow conditions inside the tunnel, and to <br />allow access to the tunnel when the elevation of the water surface in Priest Reservoir is <br />higher than the elevation of Priest Portal. The project consists of constructing a bypass <br />tunnel, a FCF access shaft and related appurtenances, installing flow control valves and <br />associated mechanical, electrical, and instrumentation as well as construction of a new <br />Mountain Tunnel adit at Priest Reservoir, and a new access road to the FCF. The bypass <br />will be fully steel lined to accommodate higher operating pressures, and a concrete plug will <br />be constructed at the upstream end where water is diverted into the FCF. Project capital <br />costs include costs incurred in FY 2017-18 and subsequent fiscal years until the project is <br />complete. <br />5. Kirkwood Penstock Project means repair, rehabilitation or replacement of the penstock <br />between the Canyon Portal Valve House and the outside of the northern wall of the <br />Kirkwood Powerhouse. The Joint classification for this project would exclude valves, <br />electronic controls and other appurtenances needed for power operations but not for <br />delivery of water to the Bay Area. Project capital costs include costs incurred in FY 2009-10 <br />and subsequent fiscal years until the project is complete. <br />6. Moccasin Dam Interim Repairs means repairs and improvements related to damage <br />caused by the March 22, 2018 storm with the goal of returning the reservoir to service at a <br />restricted water pool elevation. The interim measures include repairs and improvements to <br />the Moccasin Creek Diversion Dam and Bypass, Moccasin Reservoir, access and <br />automation improvements at Gate No. 3 Tower, the Lower Moccasin Dam Auxiliary Spillway, <br />and the downstream channel of Moccasin Creek. Project capital costs include costs incurred <br />in FY 2017-18 and subsequent fiscal years until the project is complete. <br />7. Moccasin Dam Long-Term Improvements means upgrading the Moccasin Reservoir <br />facilities to meet long-term operational and dam safety needs, including the Lower Moccasin <br />Dam, Moccasin Creek Diversion Dam, spillways, outlet works, and other appurtenant <br />facilities, excluding the Moccasin Low Head Hydropower Plant and appurtenances. The <br />work consists of repairs and upgrades to restore the capability to accommodate changes in <br />flow associated with water delivery and power generation, provide hydraulic control for <br />delivery of water to the Bay Area, permit the discharge of excess water downstream to Don <br />Pedro Reservoir, and satisfy State regulatory requirements and guidelines. The Joint <br />classification for this project would include all work, regardless of whether or not specific <br />elements are required by the State of California. Project capital costs include costs incurred <br />in FY 2017-18 and subsequent fiscal years until project is complete. <br />8. Moccasin Penstock Project means the repair, rehabilitation or replacement of the <br />Moccasin Penstocks to ensure reliable water delivery to the Bay Area and support power <br />generation at Moccasin Powerhouse. Project facilities would extend from the western end of <br />the Moccasin Power Tunnel to the eastern wall of the Moccasin Powerhouse. The Joint <br />classification for this project would exclude valves, electronic controls and other <br />appurtenances needed for power operations but not for delivery of water to the Bay Area. <br />Project capital costs include costs incurred in FY 2009-10 and subsequent fiscal years until <br />the project is complete. <br /> <br />