Laserfiche WebLink
REV: 06-26-2023 RL <br />and cons of each option and present recommendations to Library staff and the Library <br />Board. Upon review and input from the stakeholders, Library staff will select a preferred <br />alternative, or a combination of elements from the options to create a preferred <br />alternative. Consultant will develop and finalize the preferred alternative. <br />Deliverables: Recommendations Memorandum and Meetings with Staff and Library <br />Board. <br />6. Draft Renderings of Preferred Alternative <br />Consultant will develop draft renderings for the preferred scheme to present to Library <br />staff for review and discussion. These materials will include site plans, floor plan <br />layouts, and a perspective rendering of a portion of the building to convey a design <br />impression. All work will be conceptual in nature and serve as a guide for further <br />discussion and development. <br />Deliverables: Draft renderings and meetings with Library staff. <br />7. Cost Estimate <br />Consultant has partnered with approved subconsultant mack5 to develop a cost <br />estimate based on the preferred alternative. The cost estimate will focus on the <br />conceptual construction cost, including contingencies and escalation, for the library <br />expansion and internal reorganization of the existing library spaces. <br />Deliverables: Cost Estimate Memorandum <br />8. Executive Summary and Final Report (Needs Assessment) <br />Upon completing the tasks outlined above, the final report will pull together a summary <br />of the process conducted, including meeting notes, site and building assessments, <br />community engagement summaries from the various outreach components, diagrams <br />and drawings for the draft recommendations and preferred alternative, final draft <br />renderings, cost information, and responses to comments from Library and City staff. <br />The report will contain a brief Executive Summary summarizing the entire process and <br />presenting key information in a succinct form. Consultant will modify the final draft report <br />in response to comments from Library and City staff and finalize it for approval by the <br />Library Director, publication, and presentation to the City Council, if requested. <br />Deliverables: Needs Assessment, including Executive Summary and Final Report. <br />Compensation <br />Rate Schedule <br />Key Personnel and hourly rates: <br />Chris Noll, Principal-in-Charge $290 <br />Trina Goodwin, Library Planner $230 <br />ATTY/AGR.2023.148/Noll & Tam (Downtown Library Facility Needs Assessment) (Page 14 of 15)