My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 Shape, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 Shape, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 9:14:41 AM
Creation date
8/30/2023 9:14:10 AM
Metadata
Fields
Template:
Agreement
Contractor Name
SHAPE, INC.
PROJECT NAME
flygt pumps parts, maintenance, and repair services
RMP File Number
304
Date
7/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 06-09-2023 RL <br />•Contractor will follow all safety protocols at all times, in and around the pump <br />stations, lift stations, job sites, control panels and operating service equipment. <br />•Contractor will perform pump operational tests to check voltage supply to pump <br />(with pumps off and when running), check full load amp draw of all phases to <br />ensure balance, listen to pump running to check for noise that might indicate a <br />bearing or other issue, all in an effort to identify potential issues that can be further <br />inspected when the pump is removed from the wet well. <br />•Contractor will make electrical checks of the pump motor including measuring the <br />resistance between windings, megging the motor, inspecting the power cable and <br />leads for damage, checking the pump protection sensor leads and relays <br />(MiniCas Relays) for proper operation (if applicable), and other electrical checks <br />as outlined by the 21-point Checklist (above), all in an effort to identify potential <br />issues that can be further inspected when the pump is removed from the wet well. <br />•Contractor will safely remove Flygt pumps for inspection, inspect the spacing and <br />clearance of impellers, check impellers for damage/wear, check oil/coolant and <br />replace as necessary, inspect seals and O- rings and replace, as necessary. <br />•Contractor will visually check/confirm proper rotation before reinstallation of pump. <br />Perform system performance checks including cleaning and checking level <br />sensors for correct operation and set points, checking any valves present for <br />proper operation, checking pump discharge leakage when pump is running, and <br />testing pump, and testing pump operational cycles (if possible). <br />•Contractor will perform repairs such as replacement and installation of O-rings <br />and other minor parts that are determined to need replacing during such <br />inspection. The cost of all such "minor parts" shall be included in the contract <br />price and shall not be an extra charge. These repairs do not include overhaul or <br />shop repairs. All "minor parts" shall be included and readily available on hand for <br />service technicians in the field. <br />•Any work not specifically mentioned, but which is needed to make the <br />maintenance complete within the intent of this specification shall be performed <br />without additional cost. <br />•Pumps shall be systematically examined, adjusted, cleaned, and repaired in <br />accordance with the specified inspection schedule. <br />•If additional repairs are needed for pumps, Contractor will report its findings to <br />the Wastewater and Storm Public Works Superintendent, and will seek guidance <br />from them on how to proceed (either repair or wait). <br />Extra Work, Including Unanticipated and/or Major Repairs: <br />Contractor shall provide any additional pump repairs, overhauls, or direct replacement <br />of pumps which are not included in the annual preventative maintenance. Prior to <br />performing any such additional repairs, or replacements, Contractor shall submit to <br />Wastewater and Storm Public Works Superintendent a detailed description of the work <br />determined to be necessary together with cost estimate for such work and parts and <br />obtain written approval from the Wastewater and Storm Public Works Superintendent <br />prior to commencement of work. The parties shall both execute a written change order, <br />documenting City's approval and Contractor's price and scope of work. <br />ATTY/AGR.2023.131/Shape Inc. (Flygt Pumps Maintenance) (Page 16 of 19)
The URL can be used to link to this page
Your browser does not support the video tag.