My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 Woodard & Curran, Inc.-1205 Veterans Sewer Analysis -
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Under $104K
>
Agmt23 Woodard & Curran, Inc.-1205 Veterans Sewer Analysis -
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 9:19:54 AM
Creation date
8/30/2023 9:19:36 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
consulting engineering firm to assist with analyzing impacts of a proposed development at 1205 Veterans Blvd
RMP File Number
304.5
Date
7/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 06-22-2023 JB <br />It is anticipated that up to six (6) model scenarios may need to be run to evaluate the <br />range of alternatives. The evaluations will be based solely on model analyses and will <br />not consider potential utility conflicts or constructability, permitting, or right-of-way <br />issues. Estimates of planning level construction and capital costs will be developed <br />based on the same methodology, unit costs, and cost factors used for the 2021 Draft <br />Sewer Master Plan. <br />Consultant will provide interim model results in the form of model-generated hydraulic <br />profiles, and will work with staff to prepare a Technical Memorandum (TM). The TM will <br />document the model updates and assumptions made for the evaluation. <br />Consultant will provide overall contract management of the project, including monitoring <br />of project budget and schedule, preparation of invoices, and communication with the City <br />by telephone and e-mail regarding project status and issues. Attendance at up to two <br />virtual meetings with the City to discuss assumptions and model results are included in <br />this scope of services. <br /> <br />Deliverables: <br />Model hydraulic profiles <br />Draft and final summary TMs <br />Monthly invoices and progress reports <br /> <br />Fees: <br />Consultant shall be paid at the standard hourly rate set forth in the rate schedule below. <br /> <br />Schedule: <br />Draft TM will be submitted within 28 working days after receipt of Notice to Proceed from <br />the City. Final TM will be submitted within 10 working days after receipt of City’s <br />comments on the draft TM. <br />ATTY/AGR.2023.142/Woodard and Curran (1205 Veterans Sewer Analysis) (Page 12 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.