My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Tract Pump Station Improvement Project
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Tract Pump Station Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 4:49:45 PM
Creation date
12/4/2023 4:48:35 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Price Tract Pump Station Improvement Project
RMP File Number
304
Date
11/22/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-07-23 SK <br />Structural Project Data and General Notes <br />Pump Station Foundation Plan <br />Pump Staton Roof Plan <br />Wet Well Foundation Plan <br />Wet Well Interior Platforms Plans and Details <br />Wet Well Roof Slab Plan <br />Wet Well Cross Sections <br />Typical Concrete Details <br />Pump Station Roof Framing Sections and Details <br />Pump Station Masonry Details <br />Pump Station Masonry Wall Elevations <br />Wet Well Sections and Details <br />Slide Gate Manhole Details <br />Generator Housing Plan, Elevations and Details <br />Miscellaneous Details <br />Electrical Legend and Abbreviation <br />Electrical Site Plan <br />Single-line Diagram <br />Pump Control Schematic Diagrams <br />Auxiliary Equipment Schematic Diagrams <br />Lighting and Power Plans <br />SCADA PLC Wiring Diagrams <br />Cable and Conduit Schedule, Panelboard, and Light Fixture <br />Schedules <br />Electrical Gear Elevation Details and Grounding Plans <br />Electrical Details <br />Instrumentation and Control Legend and Notes <br />SCADA Communication Diagram, Elevation Control Set Points <br />Subtask 6.4 – Engineer’s Estimate <br />Consultant will prepare calculations and quantity estimates to develop a bid <br />schedule for the project. The bid schedule will include earthwork quantities, <br />material quantities, and all other anticipated bid items associated with <br />construction of the proposed improvements such as mobilization and <br />dewatering. <br />Consultant will utilize cost data from similar projects and information from <br />local vendors to estimate probable construction costs. <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 23 of 54)
The URL can be used to link to this page
Your browser does not support the video tag.