Laserfiche WebLink
REV: 11-07-23 SK <br />Structural Project Data and General Notes <br />Pump Station Foundation Plan <br />Pump Staton Roof Plan <br />Wet Well Foundation Plan <br />Wet Well Interior Platforms Plans and Details <br />Wet Well Roof Slab Plan <br />Wet Well Cross Sections <br />Typical Concrete Details <br />Pump Station Roof Framing Sections and Details <br />Pump Station Masonry Details <br />Pump Station Masonry Wall Elevations <br />Wet Well Sections and Details <br />Slide Gate Manhole Details <br />Generator Housing Plan, Elevations and Details <br />Miscellaneous Details <br />Electrical Legend and Abbreviation <br />Electrical Site Plan <br />Single-line Diagram <br />Pump Control Schematic Diagrams <br />Auxiliary Equipment Schematic Diagrams <br />Lighting and Power Plans <br />SCADA PLC Wiring Diagrams <br />Cable and Conduit Schedule, Panelboard, and Light Fixture <br />Schedules <br />Electrical Gear Elevation Details and Grounding Plans <br />Electrical Details <br />Instrumentation and Control Legend and Notes <br />SCADA Communication Diagram, Elevation Control Set Points <br />Subtask 6.4 – Engineer’s Estimate <br />Consultant will prepare calculations and quantity estimates to develop a bid <br />schedule for the project. The bid schedule will include earthwork quantities, <br />material quantities, and all other anticipated bid items associated with <br />construction of the proposed improvements such as mobilization and <br />dewatering. <br />Consultant will utilize cost data from similar projects and information from <br />local vendors to estimate probable construction costs. <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 23 of 54)