My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 Kimley-Horn and Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 Kimley-Horn and Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:05:30 PM
Creation date
12/18/2023 2:05:11 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Agreement for Access to Downtown Bikeways
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-15-23 SK <br />EXHIBIT “A” <br />SCOPE OF SERVICES AND FEE <br />The scope of work is to develop Plans, Specifications, and Estimates (PS&E) phase and supplement <br />community outreach for two corridors under the project “Access to Downtown Bikeway Corridors” <br />(the “Project”): <br />• Vera Avenue from El Camino Real to Alameda de las Pulgas. <br />• Broadway between Walnut Street and Woodside Road. <br />These two corridors are identified in RWCMoves, the 2018 Citywide Transportation Plan, as part of <br />the “Bicycle Backbone Network” that connect neighborhoods west and south of downtown to the <br />downtown area and transit center and create safe, seamless, and convenient bike access to many <br />destinations in the area. <br />SCOPE OF WORK <br />Task 1 – Project Management and Administration <br />Consultant project manager will provide project management oversight of the Consultant project <br />team’s activities and coordinate with the City, and other stakeholders throughout the Project’s <br />duration. This does not include the construction phase of the project. It is assumed the outreach <br />and design phases of the Project will take 12-month design and outreach duration from the <br />Executive Date of the Agreement. <br />»Kick-Off Meeting: Consultant will have one (1) kick-off meeting for each roadway <br />segment (Broadway and Vera Avenue). <br />»Bi-Weekly Meetings: Consultant will participate in monthly design coordination meetings <br />during the design phase of this project. Ahead of these meetings, Consultant will develop <br />short bullet-point agendas as needed. It is anticipated that two (2) Consultant staff will <br />be present on these calls. Consultant will take and distribute meeting minutes after each <br />meeting to the City. <br />»Project Coordination: Consultant project manager and task managers will supervise, <br />coordinate, and monitor the planning and design of the Project for conformance with <br />standards and policies established between the City and the Consultant at the beginning <br />of the Project. Consultant shall coordinate with the City, stakeholders, and with various <br />planning and design functional groups for the delivery of products. In addition, Consultant <br />will maintain an accessible project folder for City staff and project design team to share <br />files and work collaboratively. <br />»Project Administration: Consultant staff’s administration efforts will include initial <br />development of work plan, filing system, and processing timely invoices. <br />It is assumed that all the meetings will be handled via conference call, including the kick-off <br />meeting. As part of this task, Consultant will prepare invoicing, billing, and summary reports. <br />ATTY/AGR.2023.270/Kimlet Horn (Access to Downtown Bikeways) (Page 11 of 16)
The URL can be used to link to this page
Your browser does not support the video tag.