My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Price Tract Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Price Tract Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:08:47 PM
Creation date
12/18/2023 2:07:26 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REV: 11-07-23 SK <br />determined. Optional Task #9 includes further information for this additional <br />service once the specific requirements are determined. <br />Deliverables for task 5: a memorandum that will show findings based on the project plans <br />and knowledge of the CEQA Guidelines (PDF). <br />TASK 6: 60% INITIAL DESIGN SUBMITTAL <br />Subtask 6.1 – Pump Design Refinement <br />• Consultant will refine the preliminary pump sizing calculations prepared <br />under Task 4. Consultant will verify wet well size, pump selection, and pipe <br />sizing. Consultant will refine footprints for the pump station wet well, discharge <br />vault, and electrical panels based on input from the structural and electrical <br />engineer and confirm alignments for proposed utilities. <br />Subtask 6.2 – Structural Engineering <br />• Consultant subconsultant BCA will review the geotechnical <br />recommendations and prepare draft structural calculations for proposed <br />structural elements. A draft set of structural calculations will be included with <br />the 60% submittal. <br />Subtask 6.3 – Drawings <br />• consultant and subconsultants will prepare construction drawings to the <br />60% level of completion following City concurrence of the preferred alternative <br />selected from the BOD. The plans will include pump station plan and profiles, <br />major mechanical and electrical equipment, electrical and operation diagrams, <br />and civil, structural, and electrical details. This project will include the following <br />plans: <br />• Civil Cover Sheet <br />• Notes and Legend <br />• Existing Conditions <br />• Access and Staging Plan <br />• Demolition/Utility Relocation Plan <br />• Site Plan <br />• Surface Improvement Plan <br />• Grading and Drainage Plan <br />• Utility Plan and Profiles <br />• Pump Station Details <br />• Pump Station Operation Diagrams <br />• Civil and Mechanical Details <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 22 of 68)
The URL can be used to link to this page
Your browser does not support the video tag.