My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Price Tract Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Price Tract Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:08:47 PM
Creation date
12/18/2023 2:07:26 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REV: 11-07-23 SK <br />• Structural Project Data and General Notes <br />• Pump Station Foundation Plan <br />• Pump Staton Roof Plan <br />• Wet Well Foundation Plan <br />• Wet Well Interior Platforms Plans and Details <br />• Wet Well Roof Slab Plan <br />• Wet Well Cross Sections <br />• Typical Concrete Details <br />• Pump Station Roof Framing Sections and Details <br />• Pump Station Masonry Details <br />• Pump Station Masonry Wall Elevations <br />• Wet Well Sections and Details <br />• Slide Gate Manhole Details <br />• Generator Housing Plan, Elevations and Details <br />• Miscellaneous Details <br />• Electrical Legend and Abbreviation <br />• Electrical Site Plan <br />• Single-line Diagram <br />• Pump Control Schematic Diagrams <br />• Auxiliary Equipment Schematic Diagrams <br />• Lighting and Power Plans <br />• SCADA PLC Wiring Diagrams <br />• Cable and Conduit Schedule, Panelboard, and Light Fixture <br />Schedules <br />• Electrical Gear Elevation Details and Grounding Plans <br />• Electrical Details <br />• Instrumentation and Control Legend and Notes <br />• SCADA Communication Diagram, Elevation Control Set Points <br />Subtask 6.4 – Engineer’s Estimate <br />• Consultant will prepare calculations and quantity estimates to develop a bid <br />schedule for the project. The bid schedule will include earthwork quantities, <br />material quantities, and all other anticipated bid items associated with <br />construction of the proposed improvements such as mobilization and <br />dewatering. <br />• Consultant will utilize cost data from similar projects and information from <br />local vendors to estimate probable construction costs. <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 23 of 68)
The URL can be used to link to this page
Your browser does not support the video tag.