Laserfiche WebLink
<br />REV: 11-07-23 SK <br />• Structural Project Data and General Notes <br />• Pump Station Foundation Plan <br />• Pump Staton Roof Plan <br />• Wet Well Foundation Plan <br />• Wet Well Interior Platforms Plans and Details <br />• Wet Well Roof Slab Plan <br />• Wet Well Cross Sections <br />• Typical Concrete Details <br />• Pump Station Roof Framing Sections and Details <br />• Pump Station Masonry Details <br />• Pump Station Masonry Wall Elevations <br />• Wet Well Sections and Details <br />• Slide Gate Manhole Details <br />• Generator Housing Plan, Elevations and Details <br />• Miscellaneous Details <br />• Electrical Legend and Abbreviation <br />• Electrical Site Plan <br />• Single-line Diagram <br />• Pump Control Schematic Diagrams <br />• Auxiliary Equipment Schematic Diagrams <br />• Lighting and Power Plans <br />• SCADA PLC Wiring Diagrams <br />• Cable and Conduit Schedule, Panelboard, and Light Fixture <br />Schedules <br />• Electrical Gear Elevation Details and Grounding Plans <br />• Electrical Details <br />• Instrumentation and Control Legend and Notes <br />• SCADA Communication Diagram, Elevation Control Set Points <br />Subtask 6.4 – Engineer’s Estimate <br />• Consultant will prepare calculations and quantity estimates to develop a bid <br />schedule for the project. The bid schedule will include earthwork quantities, <br />material quantities, and all other anticipated bid items associated with <br />construction of the proposed improvements such as mobilization and <br />dewatering. <br />• Consultant will utilize cost data from similar projects and information from <br />local vendors to estimate probable construction costs. <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 23 of 68)