My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Price Tract Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Price Tract Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:08:47 PM
Creation date
12/18/2023 2:07:26 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REV: 11-07-23 SK <br />• If the consistency of the subsurface materials encountered at the project <br />location should dictate deeper borings, or in the event drilling duration is greater <br />than that outlined in the fee matrix due to unforeseen site conditions, or if <br />additional geotechnical laboratory testing and engineering is required, <br />Consultant will provide those services as an additional service. <br />• Special provisions to deal with or handle contaminated drill cuttings or <br />groundwater, or the need for personal protective gear pertinent to unknown site <br />contaminants other than Level D equipment (safety boots, hard hat, gloves, & <br />goggles) are not included. <br />• Consultant assumes work will be completed during normal business hours. <br />• The fee by the license waste hauler for the disposal of the drill cuttings <br />assumes the soil is clean from an environmental standpoint. <br />• This scope assumes that soil conditions encountered during construction <br />are similar to those anticipated during the design phase. Should the situ <br />conditions be different that anticipated, additional geotechnical services during <br />construction may be required. <br />• The location of the additional boring, if required, is assumed to be <br />accessible. Coordination with private land owners to facilitate that boring and <br />obtaining special permissions is not included. If coordination with private land <br />owners is needed for access or for the boring itself, Consultant can provide that <br />as an additional service. <br />STRUCTURAL SCOPE <br />• The design of structures shall be based on the latest version of the <br />California Building Code (CBC). <br />• Construction inspection services are assumed to be provided by others but <br />may be provided as an additional service. <br />• Specifications are assumed to be prepared using CSI Standards. <br />• The Contractor is responsible for the design and construction of all required <br />formwork and showing for the new and existing structures. <br />• Consultant assumes each shop drawing will require a maximum of one <br />resubmittal after review of the original shop drawing. Additional reviews of shop <br />drawings, if required, will be considered as an additional service. <br />• Changes requested by the City or Contractor to the permit set of plans to <br />facilitate construction for the convenience of the Contractor or as a cost savings <br />measure for the Contractor is not included. <br /> <br />HVAC SCOPE <br />• The new pump station building is assumed not to require water proofing. <br />However, the wet well will be lined to prevent groundwater inflow. Consultant’s <br />in-house architect to provide language for the Contractor to follow industry <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 29 of 68)
The URL can be used to link to this page
Your browser does not support the video tag.