Laserfiche WebLink
KEY MEMBERS <br />City of Redwood City Price Tract Storm Drain Pump Station Improvement Project 27 <br />Erik Moreno, PE, QSD/P Project Manager BKF ENGINEERS <br />QUALIFICATIONS PROJECT ROLE EXPERIENCE <br /> -Years of Experience: 12 -B.S., Civil Engineering, University of California, Davis -Professional Civil Engineer, CA No. 81983 -Qualified SWPPP Developer and Practitioner No. 26096 <br />Erik will serve as project manager for the duration of the project and will be the City’s main point of contact. His day-to-day activities will include monitoring schedules, budget management, value management, and contract document review. Erik has a wide range of project experience that includes stormwater management planning, hydrologic and hydraulic modeling, green and grey stormwater infrastructure design, creek and river restorations, stormwater monitoring, and third-party technical review. <br /> -Redwood Shores Levee Improvements & FEMA Accreditation, Redwood City -Mission Bay Storm Drain Pump Station #3, San Francisco -Marin City Pond Flood Reduction, Marin -1180 Main Street Overland Flow Analysis, Redwood City -Pier 70 Special Use District Waterfront Site, San Francisco -Northrop Grumman Utility Replacement, Sunnyvale -Yerba Buena Island Redevelopment, San Francisco <br />TASK 1 TASK 2 TASK 3 TASK 4 TASK 5 TASK 6 TASK 7 TASK 8 TASK 9 TASK 10 <br />Sravan Paladugu, PE, CFM, QSD/P QA/QC Manager BKF ENGINEERS <br />QUALIFICATIONS PROJECT ROLE EXPERIENCE <br /> -Years of Experience: 19 -M.S., Civil Engineering, University of Utah, Salt Lake City -B.S., Civil Engineering, Osmania University, India -Professional Civil Engineer, CA No. 74343 -Qualified SWPPP Developer and Practitioner No. 00993 -Certified Floodplain Manager (CFM) <br />As QA/QC manager, Sravan’s role will include an independent review of our team’s work product, reviewing proposed alternatives with reference to feasibility, design standards, and constructability. He will also provide value engineering throughout the design process to validate the project’s life cycle cost. <br /> -Redwood Shores Levee Improvements & FEMA Accreditation, Redwood City -San Carlos Airport Levee Improvements and FEMA Accreditation, San Carlos -Mission Bay Storm Drain Pump Station #3 & #5, San Francisco -Marin City Pond Flood Reduction, Marin <br />Brian Scott, PE Principal-in-Charge BKF ENGINEERS <br />QUALIFICATIONS PROJECT ROLE EXPERIENCE <br /> -Years of Experience: 26 -B.S., Civil Engineering, University of California, Davis -Professional Civil Engineer, CA No. 61034 <br />Brian will serve as the principal-in-charge, holding authority to negotiate and contractually bind BKF. He will leverage his 26 years of experience to ensure Erik, project manager, is equipped with the necessary resources to deliver the project on time and within budget. <br /> -Bayfront Canal Flood Control and Habitat Mitigation Project, Redwood City -Sanitary Sewer Pump Stations 8&9, Redwood City -FOSMD Sanitary Sewer Improvements, Redwood City -Marin City Pond Flood Reduction, Marin -Mission Bay Storm Drain Pump Station #3, San Francisco <br />TASK 1 <br />TASK 1 TASK 2 TASK 3 TASK 4 TASK 5 TASK 6 TASK 7 TASK 8 TASK 9 TASK 10 <br />REV: 11-07-23 SK <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 47 of 68)