Laserfiche WebLink
City of Redwood City Price Tract Storm Drain Pump Station Improvement Project 29 <br />KEY MEMBERS <br />Stephanie Tanverakul, PE, PMP Hydrology & Hydraulics Lead BKF ENGINEERS <br />QUALIFICATIONS PROJECT ROLE EXPERIENCE <br /> -Years of Experience: 10 -B.S., Environmental Engineering, University of California, Merced -M.S., Civil and Environmental Engineering, San Jose State University -Professional Civil Engineer, CA No. 85508 -Project Management Professional, No. 2863915 <br />Stephanie specializes in water resources engineering and project management with noted experience in the design and hydraulic modeling of drinking water, sanitary sewer, and storm sewer system infrastructure (including pump stations, pipelines, and storage tanks), open channel design, and capital improvement infrastructure planning. <br /> -Charcot Area Storm Drain Improvement, San Jose -Casa Baywood Creek Bank Stabilization, San Mateo -Mountain View Annual Water & Sewer Main Replacements 19-21 & 19-22, Mountain View -Daly City Storm Drain Master Plan, Daly City <br />TASK 3 TASK 4 <br />Anthony Notaro, PE Structural Engineer Biggs Cardosa Associates, Inc. <br />QUALIFICATIONS PROJECT ROLE EXPERIENCE <br /> -Years of Experience: 34 -B.S. Architectural Engineering, California Polytechnic State University, San Luis Obispo -Engineer Officers Basic Course, United states Army Corps of Engineers -Professional Engineer, CA No. C51739 <br />Anthony will serve as the structural engineer. He will oversee the structural assessment and will provide recommendations for the repair, rehabilitation or replacement of the structures. Anthony will lead the design of all structural elements and conduct quality control reviews in addition to resolving any design challenges. <br /> -San Jose Trash Capture Device Installation Project, San Jose -Citywide Trash Capture Project Phase 1, Mountain View -Baylands Pump Station No. 2 Assessment and Rehabilitation, Sunnyvale -San Francisquito Storm Water Pump Station, Palo Alto -Chrysler Storm Water Pump Station Improvements, Menlo Park <br />TASK 2 TASK 6 TASK 7 TASK 8 TASK 9 TASK 10 <br />Norm Dyer, CASp ArchitectBKF ENGINEERS <br />QUALIFICATIONS PROJECT ROLE EXPERIENCE <br /> -Years of Experience: 44 -B.S., Architecture, California Polytechnic State University, San Luis Obispo -California Architect - CA (14435) -Certified Access Specialist No. CASp-760 <br />Norm will be the as needed designated architect for Task 10. Norm is a CASp certified registered architect with more than 44 years of development consulting experience related to site development, grading, and ADA design. His experience with both architectural and engineering site design has resulted in cost-effective solutions. <br /> -Elgin and Verona Pump Stations Rehabilitation, Alameda -Marina Restroom Building ADA Compliance, Redwood City -Bay Road Office Renovation, Redwood City -Brentwood Water Emergency Back-up Generators, Brentwood -Vallejo On-Call Development Review, Vallejo <br />As Needed <br />REV: 11-07-23 SK <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 49 of 68)