My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Price Tract Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Price Tract Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:08:47 PM
Creation date
12/18/2023 2:07:26 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Redwood City Price Tract Storm Drain Pump Station Improvement Project <br />CALLANDER Role Task Optional Task <br />Dave Rubin, PLA, QSD, ASLA Principal Dave will provide oversight for the project and assure quality control 5 <br />Melinda Wang Job Captain Melinda will provide day to day management of the project 5 <br />Brian NeshekDesigner Brian will prepare most of the production deliverables.5 <br />Danielle Zepeda Project Admin. <br />Danielle Admin will provide project support and assist with project deliverables such as technical specifications, cost estimate and other project deliverables. <br />5 <br />Shawn Sanfilippo Construction Manager <br />Shawn will provide supplementary construction support to BKF and the City in administering the construction phase of the project. <br />5 <br />MIG, Inc Role Task Optional Task <br />Mike Campbell, AICP .Director of Environmental Analysis <br />Mike will oversee preparation of the memorandum, provide QA/QC on the memo prior to submittal to the City. Serve as principal contact for the client. . <br />5 <br />Tay PetersonDirector of Biological Resources <br />Research and provision of technical assistance regarding biological resource impacts of the proposed pump station replacement project. <br />5 <br />Christina LauSenior Project Manager Research of CEQA statutes and provisions and drafting of the CEQA process memo 5 <br />REV: 11-07-23 SK <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 57 of 68)
The URL can be used to link to this page
Your browser does not support the video tag.