Laserfiche WebLink
REV: 12-20-23 VR <br />the benefits, and consequences of site-specific, near-term actions and longer-term <br />strategies. Specific tasks include: <br />Develop elevations of sea level rise and storm surge boundary conditions for the <br />site. <br />Perform risk analysis on existing conditions and proposed concept. Risk <br />assessment will include vulnerable infrastructure, buildings, and other features. <br />Develop onsite coastal flooding simulation using a digital elevation model of the <br />site to study various adaptation scenarios and provide flood mitigation design <br />criteria to Schaff & Wheeler. <br />Provide conceptual extents of adaptation solutions and timing estimates of critical <br />infrastructure upgrades required for the site to continue to operate as planned. <br />($48,360). <br />ATTY/AGR.2023.318/Raimi + Associates (Redwood Life Precise Plan) (Page 34 of 45)