REV: 01-17-24 MI <br />iii. For each pipe segment and manhole the Consultant shall <br />calculate the likelihood of failure and propose specific <br />recommendations for follow-up activities, such as rehabilitation. <br />b. A GIS Shapefile – Consultant will also provide a GIS shapefile for the <br />basin that shows pipe segments color coded by their likelihood of <br />failure, including a legend indicating the color-code convention. <br />Task Descriptions <br />1. Sewer Trunk Main CCTV <br />CCTV inspection of reinforced concrete pipe (RCP) trunk sewer mains (approximate <br />total linear footage: 6,040 LF) shall be performed both in the public right-of-way and <br />easement areas. Task 1 is anticipated to require evening work due to flow patterns, <br />and the use of a float for CCTV rather than a crawler unit. <br />Year 1: <br />Pipe Diameter <br />(inches) <br />Basin DT2* <br />Approximate Length (linear feet) <br />Number of Pipe <br />Segments* <br />16 350 1 <br />30 2,224 9 <br />33 2,047 7 <br />36 72 4 <br />42 27 2 <br />48 1,320 4 <br />TOTAL 6,040 27 <br />*Approximately 9 pipe segments are within easements, totaling approximately <br />2,224 linear feet. <br />2. Sanitary Sewer Basin Cleaning and CCTV <br />CCTV inspection for sanitary sewer basins 4 and 5A – F, (approximately 267,404 <br />total linear footage shall be completed by Consultant in the initial two year term:). A <br />similar schedule below shall be followed in subsequent two-year terms of the <br />Agreement, as directed by the City <br />ATTY/AGR.2024.007/APS Environmental, Inc. (Routine & Ad Hoc CCTV Inspection Services) (Page 17 of 21)