My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 Schaaf & Wheeler
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Agmt24 Schaaf & Wheeler
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2024 11:57:55 AM
Creation date
7/26/2024 11:57:20 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Schaaf & Wheeler
RMP File Number
304.5
Date
6/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 05-08-24 VR <br />Scope of Services Assumptions: <br /> One draft and one final basis of design report is assumed to cover preliminary <br />equipment selection and alternatives assessment for SSPS 22 and 23. <br /> S&W assume the City will provide records of existing infrastructure within the project <br />area including drawings, engineering reports, and other supporting documentation <br />related to the existing SSPS 22, 23, the shared forcemain, discharge location/elevation <br />and other impacted SSPSs. <br /> Coordination with Telstar (City’s preferred integrator) during design is covered under this <br />scope of services. <br /> Telstar (City’s preferred integrator) review time for SCADA related equipment submittals <br />is included under this scope of services. <br /> Telstar (City’s preferred integrator) integration of contractor installed equipment during <br />construction will be included under the selected contractor’s scope of work and is not <br />included herein. <br /> S&W assume that inspection and monitoring activities will be performed by the City. <br /> S&W assume that permit fees will be waived for this project. <br /> S&W assume that a radio path survey for SCADA/Communications is not required and is <br />therefore not included in this scope of services. <br /> S&W assume that City Building Permit, Title 24 calculations and forms are not required <br />for this project. <br /> S&W assumes that the design will comply with the requirements of the 2022 California <br />Building Code and Public Works Standards. <br />ATTY/AGR.2024.064/Schaaf & Wheeler (Agreement for Services for Design Services) (Page 16 of 20)
The URL can be used to link to this page
Your browser does not support the video tag.