My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 Schaaf & Wheeler
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Agmt24 Schaaf & Wheeler
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2024 11:57:55 AM
Creation date
7/26/2024 11:57:20 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Schaaf & Wheeler
RMP File Number
304.5
Date
6/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 05-08-24 VR <br />Task 9: Record Drawings and Project Closeout <br />The following services shall be provided once substantial completion of the project is achieved. <br />1. Participate in the final inspection and assist with punch list of deficiencies. <br />2. Prepare "As-Built" record drawings based on construction field notes and limited fieldreview <br />by the Consultant. <br />Deliverables: <br />Consultant will furnish one digital copy of as-built record drawings. <br />Optional Tasks: <br />The following services can be provided upon authorization by the City. <br />Optional Task A: Potholing <br />1. Potholing services including all necessary equipment and personnel, all necessary permits <br />from the City (we assume permit fees can be waived), notification to USA 48 hours prior to <br />potholing, traffic control, backfill to City standards, summary information sheet for each pothole <br />performed. <br />Deliverables: <br />Consultant will furnish one digital copy of pothole summary sheets. <br />Optional Task B: Separate Bid Packages for SSPS 22 and 23 <br />Separate plans, specifications, and opinion of probable costs can be provided if each pump <br />station is to be bid separately. This optional task covers the level of effort, in addition to Tasks 1- <br />9, required to provide separate bid documents for 60%, 90% and 100% deliverables assuming <br />separate bid packages for each station. This includes additional construction support services <br />for submittal review and RFI response. <br />Deliverables: <br />Consultant shall furnish one digital copy of the 60%, 90%, 100% PS&E packages for each <br />station. Consultant will also provide AutoCAD DWG linework upon request. <br />ATTY/AGR.2024.064/Schaaf & Wheeler (Agreement for Services for Design Services) (Page 15 of 20)
The URL can be used to link to this page
Your browser does not support the video tag.