Laserfiche WebLink
REV: 05-08-24 VR <br />3. Coordinate with City’s SCADA consultant, Telstar Instruments, for the 90% design of the PLC <br />unit and control system programming. <br />Deliverables: <br />Digital copies of the 90% plan set (including AutoCAD DWG files), specifications, and <br />Engineer’s Estimate. All City comments and/or request for clarifications must be answered and <br />incorporated into the design submittal prior to Task 6. <br />Task 6: Final Design (100% Design Submittal) <br />With the City's approval, the Consultant shall proceed with the Final Design. Specific tasks in <br />this phase include: <br />1. Incorporate 90% Design Submittal review comments. <br />2. Prepare 100% Design Submittal consisting of complete construction documentsincluding <br />drawings, specifications, and cost estimates. <br />3. The 100% Design Submittal shall be ready for signature and submitted to the City for review <br />and approval. A marked set will be returned along with staff's comments and/or request for <br />clarifications for revision. <br />Deliverables: <br />Digital copies of plans, specifications and estimate for the project. Consultant shall also furnish <br />an electronic copy of the drawings in AutoCAD and in PDF format, specifications in Word, cost <br />estimate, and probable construction schedule in Excel. <br />Task 7: Bid Support Services <br />The following services shall be provided during the bidding process and construction phase of <br />the project. <br />1. Schaaf & Wheeler to coordinate, attend, and prepare agenda and meeting minutes for the <br />Pre-Bid Meeting <br />2. Provide written design clarification responses during bid phase. <br />3. Respond to written questions from prospective bidders. Assist in issuing addenda, as directed <br />by the City. <br />Task 8: Construction Support Services <br />The following services shall be provided during the construction phase of the project. <br />1. Schaaf & Wheeler to coordinate, attend, and prepare agenda and meeting minutes for the <br />pre-construction meeting. <br />2. Attend Construction site visits as needed during construction at appropriate stages. (Up to <br />five site visits assumed) <br />3. Review shop drawings submittals, change order requests, requests for information and <br />provide written recommendations to the City. (25 submittal reviews, each with one resubmittal <br />are assumed. 10 RFIs are assumed). <br />ATTY/AGR.2024.064/Schaaf & Wheeler (Agreement for Services for Design Services) (Page 14 of 20)