My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC20-08 0088 PC Reso granting approval of a Use Permit for 690 Veterans Blvd
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2020
>
Reso PC20-08 0088 PC Reso granting approval of a Use Permit for 690 Veterans Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:49:43 AM
Creation date
7/31/2024 9:49:15 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
9/15/2020
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:49 AM
Modified:
7/31/2024 9:49 AM
Text:
http://www.redwoodcity.org/departments/community-development-department/engineering-transportation/engineering/engineering-standards
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:49 AM
Modified:
7/31/2024 9:49 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH29STSIWOUSRI-W_ARTICIENST_S29.1ADPUWOSTSPRE
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:49 AM
Modified:
7/31/2024 9:49 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.243PERE
ID:
4
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:49 AM
Modified:
7/31/2024 9:49 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.242UNUT
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0088/PC RESO GRANTING APPROVAL OF A USE PERMIT FOR 690 VETERANS BLVD <br />REV: 09-08-2020 PR <br />Page 12 of 19 <br />Administrator. Where required by Chapter 41 of the City’s Municipal Code, the applicant shall also submit certification by a registered professional engineer or architect that the standards for elevation and floodproofing have been satisfied. [COA][ENGINEERING] Utility Infrastructure Improvements 23. Conformance with the City’s Engineering Standards – All public improvements shall be designed and constructed in accordance with the City’s Engineering Standards. [SDR][ENGINEERING] 24. Encroachment Permits – Obtain an Encroachment Permit from the Engineering and Transportation Division for work listed below. This permit shall be obtained prior to the commencement of construction of the road, utilities, or any site improvements. [SDR][ENGINEERING] a. Work in the City public right-of-way, easements or property in which the City holds an interest. b. Work requiring a grading permit. Grading permits require a Plot and Finished Grading Plan prepared by a California-registered Civil Engineer. c. Work requiring on-site shoring which affects the public right of way d. Work using the public right-of-way for any fixed structure (awnings, roof overhangs, fixed planters, etc.). Insurance, meeting the City’s standards, is required. This permit will be recorded against the property. 25. Sewer Capacity – Prior to encroachment permit issuance, submit to the City, and obtain approval of, an evaluation and report prepared by a licensed engineer demonstrating that the existing sewer mains have sufficient capacity for the project. The study shall consider existing, project, other approved projects, and applications currently under review in determining the needed capacity. If the existing sewer main is less than 6” in size, or is in any other way not sufficient as determined by the City Engineer, applicant shall, as part of the Project, construct and install new sewer mains sufficient to meet such requirements, in accordance with the City's Engineering standards and as directed by the City Engineer to the City Engineer's satisfaction. [SDR][ENGINEERING] 26. Peak Wet Weather Flow Capacity – Redwood City has exceeded its Peak Wet Weather Flow (PWWF) capacity in the past. A methodology to reduce inflow and infiltration (I/I) by pipe replacement was determined. The applicant shall reduce (I/I) to offset increased sewer demand from the project by replacing aged sewer mains or pay an equivalent in-lieu fee. The length of pipe replacement required or the amount of fee will be based on the project’s sewage generation projection (Attachment L of the City’s Engineering Standards). For parcels within Redwood City but connecting to County owned and maintained sewer, an I/I in-lieu fee may be collected by Redwood City if the County does not require main replacement or collect and in-lieu fee. . [COA][ENGINEERING] 27. Sewer Lateral Limit – The project is limited to one sewer lateral per parcel. [COA][ENGINEERING] 28. Sewer Lateral Size for Commercial Development - For new or remodeled commercial buildings, sewer laterals less than 4” shall be upgraded to a minimum 6” size. [SDR] [ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.