Laserfiche WebLink
ATTY/RESO.0088/PC RESO GRANTING APPROVAL OF A USE PERMIT FOR 690 VETERANS BLVD <br />REV: 09-08-2020 PR <br />Page 14 of 19 <br />36. Fire Flow - The Project shall meet fire flow requirements as established by the Fire Department which are based on the Fire Code. Fire flow tests are typically performed during the preliminary design phase but must be completed prior to submittal of final design. Applicant shall contact the Fire Department for fire flow requirements, and then submit a written fire flow test request to Engineering. [COA][ENGINEERING] 37. C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance with San Mateo County C.3 Stormwater Technical Guidance. [SDR][ENGINEERING] a. Treatment Controls – Treatment measures to be shown on final improvement or grading plans shall not differ materially from the treatment measures presented on the project’s Tentative Map, dated December 2019, without written approval from the Engineering Department. b. Treatment Measure Inspection – Applicant shall coordinate installation of stormwater treatment measures with the municipality, shall arrange to have the City’s designated inspector present at the time of installation, and shall have the City’s designated inspector complete a final inspection of installed stormwater treatment measure immediately after installation is complete. 38. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that includes, at a minimum, exhibit(s) showing drainage areas and location of Low Impact Development (LID) treatment measures; total project site area and total area of land disturbed; total new and/or replaced impervious area; treatment measures and hydraulic sizing calculations; a listing of source control and site design measures to be implemented at the site; saturated hydraulic conductivity rate(s) at relevant locations or hydrologic soil type (A, B, C or D) and source of information; elevation of high seasonal groundwater table; and a brief summary of how the project is complying with Provision C.3 of the MRP. [COA][ENGINEERING] 39. Construction General Permit – For construction activity resulting in a land disturbance of one acre or more, applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board under the Construction Activities Storm Water General Permit (General Permit). The NOI indicates the applicant’s intent to comply with the San Mateo Countywide Stormwater Pollution Prevention Program, including a Stormwater Pollution Prevention Plan (SWPPP). [SDR] [ENGINEERING] 40. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices (BMPs) for construction shall be implemented to protect water quality, in accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available electronically for inserting into project plans. [SDR][ENGINEERING] Street Infrastructure Improvements 41. Streetlights - New streetlights shall be installed, if needed, as determined by the City Engineer. Streetlights are required on the construction of a new commercial building or performance of substantial commercial remodeling with street frontage of 200 feet or more. The style and location of all streetlights shall be as determined by the City Engineer and Planning Manager. [SDR][ENGINEERING]