My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC20-08 0088 PC Reso granting approval of a Use Permit for 690 Veterans Blvd
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2020
>
Reso PC20-08 0088 PC Reso granting approval of a Use Permit for 690 Veterans Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:49:43 AM
Creation date
7/31/2024 9:49:15 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
9/15/2020
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:49 AM
Modified:
7/31/2024 9:49 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH29STSIWOUSRI-W_ARTIIICORESIDR
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:49 AM
Modified:
7/31/2024 9:49 AM
Text:
http://permits.redwoodcity.org/
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:49 AM
Modified:
7/31/2024 9:49 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH24NORE_ARTIIEXUNNO_DIV3CO_S24.32TILI
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0088/PC RESO GRANTING APPROVAL OF A USE PERMIT FOR 690 VETERANS BLVD <br />REV: 09-08-2020 PR <br />Page 15 of 19 <br />42. Green Infrastructure Improvements - Bio-retention areas shall be included in the project frontage along Brewster Avenue and Veterans Boulevard. sized to treat the half-street tributary area of the project frontage on Veterans Blvd. and Brewster Ave. [SDR][ENGINEERING] 43. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the satisfaction of the City Engineer at project completion. The Engineer shall approve the preferred layout of pavement markings triggered by changes in the public right-of-way or when pavement restoration is required. [SDR][ENGINEERING] 44. Shoring for Excavations – No tiebacks shall extend into the public right of way or onto adjacent properties without the written agreement of the City and/or private property owner. Any tie-backs within the City’s right of way shall be de-tensioned prior to permit sign-off and/or project acceptance. [COA] [ENGINEERING] Construction-Related Activities 45. Sales and Use Taxes – For commercial projects with a valuation of over $10 million, register with the Board of Equalization to create an ID prior to project construction and operation. This maximizes the City’s allocation of sales and use taxes associated with project construction. Contact Nancy Murguia, Finance Department, at (650) 780-7097 or nmurguia@redwoodcity.org. [COA][FINANCE] 46. Construction Sign - Prior to the start of any construction work, including demolition, install at least one 36” x 48” (minimum) construction sign in a visible location along the project frontage for the duration of construction. The sign shall include, at minimum, the following information: project name & address, elevation or rendering, construction manager (name, phone number), anticipated completion (season, year), and the City’s permitting website http://permits.redwoodcity.org [COA][PLANNING] 47. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere to the City’s Noise Ordinance. If possible, the noisiest construction activities would be scheduled for daytime hours when the ambient noise levels are highest. [SDR][BUILDING] 48. Pre-Construction Meeting - After City permits are approved, but prior to start of construction, hold a preconstruction conference with Engineering and Building staff and other interested parties. The developer shall arrange for the attendance of the construction manager, contractor, and all subcontractors who are responsible for grading and erosion and sedimentation protection controls. [COA][ENGINEERING] 49. Construction Management and Staging - Prior to encroachment permit issuance, submit a construction parking management plan, which shall outline the number of construction workers by phase, phase duration, where parking will be located for each phase. Construction parking, material storage, equipment, or other construction-related uses are not allowed within the City right of way without prior approval from the City Engineer. [COA][ENGINEERING] 50. Lane Closures - Traffic control for lane closures shall conform to the Work Area Traffic Control Handbook. Street closures require submission of traffic control plans and approval in advance. [SDR][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.