Laserfiche WebLink
<br />ATTY/RESO.0125/PC RESO SOUTH MAIN MIXED USE PROJECT – ENTITLEMENT <br />REV: 10-27-2020 PR <br />Page 15 of 38 <br /> <br />g. Entertainment Establishment totaling approximately 19,000 sq. ft. located on the ground <br />floor and fronting El Camino Real between Beech and Cedar (Parcel B). This space shall be <br />occupied with a family-oriented entertainment use. <br />If the applicant is unable to secure a viable tenant, after demonstrating its efforts, the <br />City may allow the space to be used as a small format grocery store or other permitted <br />retail use that is deemed acceptable by City. This mod ification in use shall be reviewed <br />and authorized by the Community Development and Transportation Director and may <br />require circulation modifications at Beech Street and El Camino Real, as determined by <br />the City Engineer. <br />Fees <br />The following fees must be paid in full prior to issuance of the building permit unless otherwise described <br />below. <br /> <br />8. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting from the <br />proposed project, estimated at $1,151,304. [SDR] [ENGINEERING] <br />9. Mitigation Improvement Fees - The project will be subject to additional fees as outlined in the <br />adopted Mitigation Monitoring and Reporting Plan and Local Transportation Analysis. [COA] <br />[ENGINEERING] <br />a. Transportation Fair Share Contributions <br />i. 101/84 Interchange Project – pay a fair share contribution to mitigate impacts on the <br />101/84 interchange, estimated at $3,917,584 based on 1,957 employees and 1,485 <br />residents. This covers contributions for the following required mitigations: MI-1, MI- <br />3a, MI-3b, and MI-5. [ENGINEERING] <br /> <br />ii. Roosevelt Avenue Traffic Calming Project - pay a fair share contribution to the <br />Roosevelt Avenue Traffic Calming Project, estimated at $572,895 based on the project <br />contributing to an average of 22% of the cumulative growth on Roosevelt Avenue. <br />This was identified as the preferred mitigation improvement for this deficiency. (MI- <br />7) [ENGINEERING] <br /> <br />b. Emergency Water Storage Fair Share Contribution – Pay a fair share towards the <br />emergency potable water storage needs of the City as mitigation for the project. As <br />described in the Environmental Impact Report, the estimated cost in 2011 dollars is <br />approximately $3,061.00 per residential unit or the office equivalent (approximately <br />$1,548,511). Payment is due prior to the issuance of any building permits on Parcels A-E. <br />[MMRP][ENGINEERING] <br />10. Parks Impact Fee – Pay a Parks Impact Fee for the net new dwelling units resulting from the <br />proposed project, estimated at $5.14 million. [SDR][PARKS] <br />11. School Impact Fee – For residential additions greater than 500 square feet and new commercial or <br />industrial construction, pay a School Impact Fee to the Sequoia Union High School District.