My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC20-14 0125 PC Reso South Main Mixed Use Project Entitlement Signed
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2020
>
Reso PC20-14 0125 PC Reso South Main Mixed Use Project Entitlement Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:57:05 AM
Creation date
7/31/2024 9:56:52 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
10/27/2020
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:57 AM
Modified:
7/31/2024 9:57 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVTRIMFE
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:57 AM
Modified:
7/31/2024 9:57 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVIPAIMFE
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:57 AM
Modified:
7/31/2024 9:57 AM
Text:
http://www.seq.org/+uploaded/file_1677.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTY/RESO.0125/PC RESO SOUTH MAIN MIXED USE PROJECT – ENTITLEMENT <br />REV: 10-27-2020 PR <br />Page 15 of 38 <br /> <br />g. Entertainment Establishment totaling approximately 19,000 sq. ft. located on the ground <br />floor and fronting El Camino Real between Beech and Cedar (Parcel B). This space shall be <br />occupied with a family-oriented entertainment use. <br />If the applicant is unable to secure a viable tenant, after demonstrating its efforts, the <br />City may allow the space to be used as a small format grocery store or other permitted <br />retail use that is deemed acceptable by City. This mod ification in use shall be reviewed <br />and authorized by the Community Development and Transportation Director and may <br />require circulation modifications at Beech Street and El Camino Real, as determined by <br />the City Engineer. <br />Fees <br />The following fees must be paid in full prior to issuance of the building permit unless otherwise described <br />below. <br /> <br />8. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting from the <br />proposed project, estimated at $1,151,304. [SDR] [ENGINEERING] <br />9. Mitigation Improvement Fees - The project will be subject to additional fees as outlined in the <br />adopted Mitigation Monitoring and Reporting Plan and Local Transportation Analysis. [COA] <br />[ENGINEERING] <br />a. Transportation Fair Share Contributions <br />i. 101/84 Interchange Project – pay a fair share contribution to mitigate impacts on the <br />101/84 interchange, estimated at $3,917,584 based on 1,957 employees and 1,485 <br />residents. This covers contributions for the following required mitigations: MI-1, MI- <br />3a, MI-3b, and MI-5. [ENGINEERING] <br /> <br />ii. Roosevelt Avenue Traffic Calming Project - pay a fair share contribution to the <br />Roosevelt Avenue Traffic Calming Project, estimated at $572,895 based on the project <br />contributing to an average of 22% of the cumulative growth on Roosevelt Avenue. <br />This was identified as the preferred mitigation improvement for this deficiency. (MI- <br />7) [ENGINEERING] <br /> <br />b. Emergency Water Storage Fair Share Contribution – Pay a fair share towards the <br />emergency potable water storage needs of the City as mitigation for the project. As <br />described in the Environmental Impact Report, the estimated cost in 2011 dollars is <br />approximately $3,061.00 per residential unit or the office equivalent (approximately <br />$1,548,511). Payment is due prior to the issuance of any building permits on Parcels A-E. <br />[MMRP][ENGINEERING] <br />10. Parks Impact Fee – Pay a Parks Impact Fee for the net new dwelling units resulting from the <br />proposed project, estimated at $5.14 million. [SDR][PARKS] <br />11. School Impact Fee – For residential additions greater than 500 square feet and new commercial or <br />industrial construction, pay a School Impact Fee to the Sequoia Union High School District.
The URL can be used to link to this page
Your browser does not support the video tag.