My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC20-14 0125 PC Reso South Main Mixed Use Project Entitlement Signed
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2020
>
Reso PC20-14 0125 PC Reso South Main Mixed Use Project Entitlement Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:57:05 AM
Creation date
7/31/2024 9:56:52 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
10/27/2020
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:57 AM
Modified:
7/31/2024 9:57 AM
Text:
mailto:nmurguia@redwoodcity.org
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:57 AM
Modified:
7/31/2024 9:57 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH24NORE_ARTIIEXUNNO_DIV3CO_S24.32TILI
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTY/RESO.0125/PC RESO SOUTH MAIN MIXED USE PROJECT – ENTITLEMENT <br />REV: 10-27-2020 PR <br />Page 34 of 38 <br /> <br />construction, a radio coverage test shall be conducted per the applicable codes and standards and <br />if the test fails an Emergency Responders Radio Coverage System shall be installed. Verify any Blue <br />Box phone communication requirements with the Redwood City Police Department. [COA][POLICE] <br />71. High-Rise Construction – The building is considered a High-Rise and must comply with all codes for <br />High-Rise construction if the height of the top occupied floor slab exceeds 75 feet. Height is <br />measured from the lowest point of the gutter at the lowest street elevation. [SDR][BUILDING] <br />72. Addressing and Access – The following requirements apply: [COA][FIRE] a. Addresses must be logical, sequential numbers, i.e. First Floor 101, 102, 103, Second <br />Floor 202, 203, 204, as opposed to F303, G401, etc. b. Floor plan maps shall be submitted with unit numbers at all entrances, excluding fire <br />exits. c. Provide a key pad with 24 hour access code for public safety personnel at the main <br />entrance, as opposed to just RFID readers or similar devices <br />73. Elevator Requirements – The following requirements for elevators apply: [SDR][BUILDING] <br />a. One elevator shall be available for use as an accessible means of egress in case of <br />emergency. <br />b. One elevator shall be connected to backup generator power in order to remain <br />operable during emergencies. This elevator shall be provided with appropriate <br />signage and shall extend to all floors including the lower levels of the parking <br />structure. <br />c. All additional elevators shall be connected to battery backup with sufficient power to <br />bring the elevator to the exit level in the event of an emergency. <br />d. All elevators shall be equipped with smoke curtains. <br />Construction-Related Activities <br />74. Verification for Dimensions – All dimensions, including building location on the site, setbacks, <br />building height, etc. shall be verified by a licensed surveyor. A survey report shall be provided to the <br />Building Inspector for review and approval. [COA][BUILDING] <br />75. Sales and Use Taxes – Applicant shall use good faith efforts to register with the Board of <br />Equalization to create an ID prior to project construction and operation. This maximizes the City’s <br />allocation of sales and use taxes associated with project construction. Contact Nancy Murguia, <br />Finance Department, at (650) 780-7097 or nmurguia@redwoodcity.org. [COA][FINANCE] <br />76. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. <br />Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere <br />to the City’s Noise Ordinance. If possible, the noisiest construction activities would be scheduled <br />for daytime hours when the ambient noise levels are highest. [SDR][BUILDING]
The URL can be used to link to this page
Your browser does not support the video tag.