Laserfiche WebLink
ATTY/RESO.0012/PC RESO GRANTING APPROVAL OF AN ARC PERMIT FOR 240 TWIN DOLPHIN DR <br />REV: 03-11-2021 PR <br />Page 10 of 21 <br />14. Tree Survey - Provide a tree survey that identifies type, diameter at breast height (DBH), condition and location prior to building permit issuance. [COA][PLANNING] 15. Tree Protection – Prior to any construction-related work won the site, sturdy fencing shall be installed along the dripline of Ordinance-sized trees near the project. Details and specifications shall be shown on the building permit plans. Tree protection shall be installed and inspected by the City Landscape Architect or his designee to any site preparation, excavation, and delivery of heavy equipment. [COA][PLANNING] 16. Tree Removal Permit - Obtain a Tree Removal Permit for the removal and tree trimming of all ordinance-size trees (number, type and location) defined within the City’s Tree Preservation Ordinance prior to building permit issuance. [SDR][PLANNING] 17. Tree Replacement – In the event that trees intended to be retained, both on-site and off-site, decline severely or die as a result of construction within one (1) year of project completion, the applicant shall replace such tee. The replacement mitigation will match at least the replacement value of any tree lost. 18. Stormwater Runoff - Post-construction runoff into the storm drain shall not exceed pre-construction runoff levels. The applicant’s design professional shall evaluate the project’s impact to the City’s storm drainage system and shall substantiate their conclusions with drainage calculations to the satisfaction of the City Engineer. The project shall be designed in conformance with the Drainage Guidelines for Commercial Development. [SDR] [ENGINEERING] 19. Exterior Lighting – Provide a lighting plan for proposed exterior lighting, including cut sheets, a photometric site plan demonstrating light levels and a diagram showing light spillover. This information shall be included in the building permit plans. New light sources must not introduce glare or light effects that spill off the property. [COA][PLANNING] 20. Bicycle Parking – Provide for 41 number of bicycle spaces and demonstrate this on the building permit plans. [COA][ENGINEERING] 21. Clean Air Vehicle Parking- Provide for 68 designated parking for any combination of low-emitting, fuel-efficient and carpool/vanpool vehicles. [COA] [ENGINEERING] 22. Electric Vehicle Charging Stations - Provide for and install Electric Vehicle Charging Stations (EVCS) equivalent to at least 6% of the total parking spaces for garages over 200 spaces. Provide the appropriate number of accessible EVCS with at least one van accessible, including considerations for signage and time limits. Demonstrate this on the building permit plans. [COA][ENGINEERING] 23. Resurface Street and Parking Lot – Project to install pavement overlay along the project frontage between the property and median and anywhere trenching occurs on the opposite side of the median Slurry-seal and restripe the parking lot. This work shall be included as part of the building permit plans. [COA][PLANNING] 24. Discards Collection - Prior to the issuance of a building permit, the applicant shall submit to Engineering a Discards Collection Plan for review and approval. The plan shall include the following elements and additional elements as required by City staff: [COA][ENGINEERING]