My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC21-01 0012 PC Reso Granting Approval of an ARC Permit for 240 Twin Dolphin Dr.
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2021
>
Reso PC21-01 0012 PC Reso Granting Approval of an ARC Permit for 240 Twin Dolphin Dr.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 10:00:59 AM
Creation date
7/31/2024 10:00:51 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
3/16/2021
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:00 AM
Modified:
7/31/2024 10:00 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:00 AM
Modified:
7/31/2024 10:00 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0012/PC RESO GRANTING APPROVAL OF AN ARC PERMIT FOR 240 TWIN DOLPHIN DR <br />REV: 03-11-2021 PR <br />Page 15 of 21 <br />a. Treatment Controls – Treatment measures to be shown on final improvement or grading plans shall not differ materially from the treatment measures presented on the project’s Vesting Tentative Map, approved on March 16, 2021, without written approval from the Engineering Department. b. Treatment Measure Inspection – Applicant shall coordinate installation of stormwater treatment measures with the municipality, shall arrange to have the City’s designated inspector present at the time of installation, and shall have the City’s designated inspector complete a final inspection of installed stormwater treatment measure immediately after installation is complete. 46. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that includes, at a minimum, exhibit(s) showing drainage areas and location of Low Impact Development (LID) treatment measures; total project site area and total area of land disturbed; total new and/or replaced impervious area; treatment measures and hydraulic sizing calculations; a listing of source control and site design measures to be implemented at the site; saturated hydraulic conductivity rate(s) at relevant locations or hydrologic soil type (A, B, C or D) and source of information; elevation of high seasonal groundwater table; and a brief summary of how the project is complying with Provision C.3 of the MRP. [COA][ENGINEERING] 47. Construction General Permit – For construction activity resulting in a land disturbance of one acre or more, applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board under the Construction Activities Storm Water General Permit (General Permit). The NOI indicates the applicant’s intent to comply with the San Mateo Countywide Stormwater Pollution Prevention Program, including a Stormwater Pollution Prevention Plan (SWPPP). [SDR] [ENGINEERING] 48. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices (BMPs) for construction shall be implemented to protect water quality, in accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available electronically for inserting into project plans. [SDR][ENGINEERING] Street Infrastructure Improvements 49. Mid-block Crossing – Final design of mid-block crossing including lane width, materials, grade, lighting, and safety specifications, shall be built to Engineering design criteria. [COA][ENGINEERING] 50. Streetlights - A new streetlight shall be installed, if needed, as determined by the City Engineer. Streetlights are required on the construction of a new commercial building or performance of substantial commercial remodeling with street frontage of 200 feet or more. The style and location of all streetlights shall be as determined by the City Engineer and Planning Manager. [SDR][ENGINEERING] 51. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the satisfaction of the City Engineer at project completion. When this requires additional pavement restoration, the Engineer shall approve the preferred layout of pavement markings. [SDR][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.