My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC21-01 0012 PC Reso Granting Approval of an ARC Permit for 240 Twin Dolphin Dr.
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2021
>
Reso PC21-01 0012 PC Reso Granting Approval of an ARC Permit for 240 Twin Dolphin Dr.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 10:00:59 AM
Creation date
7/31/2024 10:00:51 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
3/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0012/PC RESO GRANTING APPROVAL OF AN ARC PERMIT FOR 240 TWIN DOLPHIN DR <br />REV: 03-11-2021 PR <br />Page 14 of 21 <br />fire flow requirements in accordance with City Code Section 38.26 and the International Fire Code. If the existing water main is less than 6” in size, or is in any other way not sufficient as determined by the City Engineer, applicant shall, as part of the Project, construct and install new water mains sufficient to meet such requirements, in accordance with the City's Engineering Standards and as directed by the City Engineer. New water mains shall be 8” minimum in size and extend across the entire property frontage, from the nearest point of connection to an existing 6” or larger water main.[SDR][ENGINEERING] 40. Recycled Water Facilities – Recycled water (purple pipe) facilities shall be provided and designed in accordance with Engineering Standards for dual plumbing, irrigation, and other warranted uses per the Recycled Water Ordinance, Chapter 38. Services that are to be supplied by recycled water (either at the time of project completion or at a future date) shall be designed to properly function at the design pressure required by Engineering. Upon a final determination by the City that recycled water is available for the property, the applicant shall connect the project to the recycled water system. Pipe material for internally dual plumbed systems intended for the conveyance of recycled water shall be constructed of non-metallic materials as allowed in the California Plumbing Code, and in accordance with the City’s Recycled Water Development Standards (Attachment U of Redwood City Standard Design Criteria). [COA][ENGINEERING] 41. Recycled Water Report - The applicant shall enter into a Recycled Water Use Agreement and shall hire an engineer licensed in California and experienced in the field of wastewater treatment to prepare a recycled water report for dual plumbed facilities, pursuant to California Water Code section 13522.5 and in accordance with California Code of Regulations sections 60314 and 60323 (found within Title 22, Division 4, Chapter 3). The first draft of the report and the signed agreement shall be submitted to Engineering prior to building permit issuance, and will be routed to the Public Works Department for review and coordination. [COA] [ENGINEERING] 42. Cross-Connection Control Test - Prior to issuance of the certificate of occupancy, all applicable plumbing systems must pass a cross-connection control test, performed by a Cross-Connection Control Specialist Certified through the CA-NV Section of the AWWA and observed by Public Works staff. The cross-connection control test method must be included in the Recycled Water Report. The applicant is responsible for all fees associated with the performance of the cross-connection control test. [COA] [ENGINEERING] 43. Backflow Protection – Backflow protection on all water services is required. The backflow preventer shall be above grade and located on private property, accessible to the Public Works division for testing. [COA][ENGINEERING] 44. Fire Flow - The Project shall meet fire flow requirements as established by the Fire Department which are based on the Fire Code. Fire flow tests are typically performed during the preliminary design phase but must be completed prior to submittal of final design. Applicant shall contact the Fire Department for fire flow requirements, and then submit a written fire flow test request to Engineering. [COA][ENGINEERING] 45. C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance with San Mateo County C.3 Stormwater Technical Guidance. [SDR][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.