Laserfiche WebLink
ATTY/RESO.0012/PC RESO GRANTING APPROVAL OF AN ARC PERMIT FOR 240 TWIN DOLPHIN DR <br />REV: 03-11-2021 PR <br />Page 4 of 21 <br />The project does not include large expanses of paved area as the two small <br />surface parking lots would be located on opposite sides of the lot. The office <br />building and the parking structure would be separated by a pedestrian <br />paseo, which would be lined with landscaping a small trees. General <br />mechanical equipment and a trash enclosure would be located in the <br />structured parking and a transformer would be located to the rear of the site. <br />The parking structure would be set to the rear of the site and the façade <br />would be screened by tensile mesh with printed screening and a kinetic wall <br />to screen the vehicles from public view. <br /> <br />h. In the case of any commercial or industrial structure, the review <br />authority shall consider its proximity to any R District and shall <br />consider the effect of the proposed structure upon the character and <br />value of the adjacent R District area <br />The project is not adjacent to a Residential Zoning District and this finding <br />is not applicable to this project. The site is surrounded by multistory office <br />and hotels and is considered appropriate for the site. <br /> <br />i. The provision of permeable areas and drainage design appropriate to <br />capture and treat stormwater runoff prior to its discharge from the site <br />including, but not limited to, the use of vegetated swales, landscape <br />features, permeable pavement materials, infiltration basins or <br />engineered designs. <br />The City’s Engineering division has reviewed the Project’s landscape <br />features and areas, and bio-swale areas to capture and treat stormwater <br />run-off prior to discharge from the site, and determined that the Project <br />would comply. Conditions of Approval have also been incorporated that <br />would ensure compliance with the stormwater runoff requirements. <br /> <br />Section 4. Planned Development Permit Findings PD2019-001 (Section 46.5): <br />The Project requires approval of a Planned Development Permit for the following deviation <br />from Zoning standards: (1) reduction in the number of required in front and exterior side <br />setbacks: <br /> <br />1. Permit Finding. Decisions regarding a Planned Development Permit shall be <br />based upon the purpose statement in this sect ion. The design and <br />construction quality contained in all aspects of the development plan is <br />expected to exceed the quality standards typically required for new <br />developments located in similar zoning districts; and <br /> <br />2. Findings for Modifications to Development Standards. Modifications may be <br />granted if it is determined that the proposed development will provide an <br />environment of physical and functional desirability, in harmony with the <br />character of the surrounding neighborhood or district. <br /> <br />Reduced Setbacks. The project site is designed with development standard <br />modification to reduce the front setback from 79 feet to 49-feet-6-inches and <br />exterior setbacks from 79 feet to 44-feet-7-inches. The setback reduction <br />would increase functional use of the site by siting the building footprint closer <br />to the corner in order to promote the most functional and aesthetic relationship