My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC21-08 0069 PC Reso 955 Woodside Road
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2021
>
Reso PC21-08 0069 PC Reso 955 Woodside Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 10:06:26 AM
Creation date
7/31/2024 10:05:58 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
9/7/2021
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:06 AM
Modified:
7/31/2024 10:06 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:06 AM
Modified:
7/31/2024 10:06 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:06 AM
Modified:
7/31/2024 10:06 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH29STSIWOUSRI-W_ARTIIICORESIDR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0069/PC RESO 955 WOODSIDE ROAD <br />REV: 09-03-21 VR <br />Page 13 of 15 <br />36. Construction General Permit – For construction activity resulting in a land <br />disturbance of one acre or more, applicant shall file a Notice of Intent (NOI) with the <br />State Water Resources Control Board under the Construction Activities Storm Water <br />General Permit (General Permit). The NOI indicates the applicant’s intent to comply <br />with the San Mateo Countywide Stormwater Pollution Prevention Program, including <br />a Stormwater Pollution Prevention Plan (SWPPP). [SDR] [ENGINEERING] <br />37. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management <br />Practices (BMPs) for construction shall be implemented to protect water quality, in <br />accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). <br />BMP plan sheets are available electronically for inserting into project plans. <br />[SDR][ENGINEERING] <br /> <br />Street Infrastructure Improvements <br />38. Streetlights - A new streetlight shall be installed, if needed, as determined by the <br />City Engineer. Streetlights are required on the construction of a new commercial <br />building or performance of substantial commercial remodeling with street frontage <br />of 200 feet or more. The style and location of all streetlights shall be as determined <br />by the City Engineer and Planning Manager. [SDR][ENGINEERING] <br />39. Green Infrastructure Improvements - A treatment area shall be included in the <br />project frontage along Woodside Road sized to treat the half-street tributary area of <br />the project frontage up to the median. [SDR][ENGINEERING] <br />40. Repair or Replace Street Infrastructure - Restore streets surrounding the project <br />site to the satisfaction of the City Engineer at project completion. When this requires <br />additional pavement restoration, the Engineer shall approve the preferred layout of <br />pavement markings. [SDR][ENGINEERING] <br /> <br />Construction-Related Activities <br />41. Pre-Construction Meeting - After City permits are approved, but prior to start of <br />construction, hold a preconstruction conference with Engineering and Building staff <br />and other interested parties. The developer shall arrange for the attendance of the <br />construction manager, contractor, and all subcontractors who are responsible for <br />grading and erosion and sedimentation protection controls. [COA][ENGINEERING] <br />42. Construction Management and Staging - Prior to encroachment permit issuance, <br />submit a construction parking management plan, which shall outline the number of <br />construction workers by phase, phase duration, where parking will be located for <br />each phase. Construction parking, material storage, equipment, or other <br />construction-related uses are not allowed within the City right of way without prior <br />approval from the City Engineer. [COA][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.