Laserfiche WebLink
ATTY/RESO.0069/PC RESO 955 WOODSIDE ROAD <br />REV: 09-03-21 VR <br />Page 14 of 15 <br />43. Lane Closures - Traffic control for lane closures shall conform to the Work Area <br />Traffic Control Handbook. Street closures require submission of traffic control plans <br />and approval in advance. [SDR][ENGINEERING] <br />44. Winterizing - If construction is not complete by the start of the wet season (October <br />1 through April 30), implement a winterization program to minimize the potential for <br />erosion and sedimentation. As appropriate to the site and status of construction, <br />winterization requirements shall include inspecting/maintaining/cleaning all soil <br />erosion and sedimentation controls prior to, during, and immediately after each <br />storm event; stabilizing disturbed soils through temporary or permanent seeding, <br />mulching, matting, tarping or other physical means; rocking unpaved vehicle access <br />to limit dispersion of much onto public right-of-way; and covering/tarping stored <br />construction materials, fuels, and other chemicals. Plans to include proposed <br />measures to prevent erosion and polluted runoff from all site conditions shall be <br />submitted for approval by CDD prior to beginning construction. As site conditions <br />warrant, the City Engineer may direct the applicant to implement additional <br />winterization requirements. [COA][ENGINEERING] <br /> <br />45. Grading – Grading shall be performed in accordance with the City’s Engineering <br />Standards. Soil or other construction materials shall not be stockpiled in the public <br />right-of-way. Submit cut/fill volumes (CY) for all soils to be imported to or exported <br />from the site. [SDR][ENGINEERING] <br /> <br />46. Monitoring - The Soils Engineer shall conduct continuous site inspections during <br />trenching and backfill operations at the applicant’s expense. The Soils Engineer <br />shall take compaction tests and submit the results to Engineering & Construction. <br />[SDR][ENGINEERING] <br /> <br />47. Dust Control – Dust control measures shall be required for any excavation of the <br />site. If the Geotechnical Report indicates that serpentine soil or cinnabar is present <br />on site, the dust control measures shall include the standard procedures for ensuring <br />that friable asbestos and/or mercury are not emitted from the site. <br />[COA][ENGINEERING] <br />48. Transportation Demand Management Program – A final Transportation Demand <br />Management (TDM) program, describing the elements to be implemented, shall be <br />reviewed and approved prior to certificate of building occupancy. The TDM program <br />shall include an annual reporting requirement for the life of the project that details <br />overnight parking utilization rates and resident use and awareness of the program. <br />Annual reporting shall be made by January 31 of each year. [COA][ENGINEERING] <br />Other Agency Permits <br />49. Caltrans - If a portion of the proposed work is within the State of California right-of- <br />way (Woodside Road, El Camino Real), the applicant shall contact the California <br />Department of Transportation (Caltrans) at (510) 286-4417 to obtain all necessary <br />Encroachment Permits. [SDR][ENGINEERING]