Laserfiche WebLink
ATTY/RESO.0099/PC RESO FOR 1417 MIDDLEFIELD RD <br />REV: 11-12-2021 JB <br />Page 10 of 16 <br />14. Stormwater Runoff - Post-construction runoff into the storm drain shall not exceed pre-construction runoff levels. The applicant’s design professional shall evaluate the project’s impact to the City’s storm drainage system and shall substantiate their conclusions with drainage calculations to the satisfaction of the City Engineer. The project shall be designed in conformance with the Drainage Guidelines for Residential or Commercial Development. [SDR] [ENGINEERING] Parcel Map 15. Parcel Map - Obtain approval and record a Parcel Map prior to building permit issuance. The parcel map shall include the lot configuration and proposed easements, including but not limited to the driveway/parking easement, and conform to the Subdivision Map Act and Chapter 30 of the Municipal Code [SDR][ENGINEERING] 16. Removal of Existing Garage – Prior to Final Parcel Map approval, obtain a demolition permit and remove the existing garage located on the property line. [COA][ENGINEERING] 17. Driveway/Parking Easement – Prior to Parcel Map approval, prepare and record an easement, in a form acceptable to the City Attorney, memorializing the driveway easement identified on the Parcel Map. The easement dedication shall state that the easement cannot be removed without written approval from the City. [COA][ENGINEERING] 18. Agreements - Prior to Final Parcel Map approval, enter into the following agreements in a form acceptable to the City Attorney and the Community Development Director: [COA][ENGINEERING] a. A Landscape Maintenance Agreement for all assigned landscape areas in public rights of way, easements, and/or on property in which the City holds an interest to be maintained. Maintenance items shall include, but are not limited to, planting trees, shrubs, flowers, grass and all appurtenances including irrigation systems and pedestrian scale lighting. b. A Stormwater Treatment Measures Maintenance Agreement for all on-site stormwater treatment measures associated with the project. c. An Improvement Agreement to guarantee the installation of all improvements required of the project and to provide for payment of all City inspection and plan check charges associated with the installation of public and private improvements, including, but not limited to, streets, sanitary sewers, water, storm drains and street lights. Reports and Surveys 19. Geotechnical Report - Include a geotechnical field review and reports for all grading work, prepared by a licensed geotechnical engineer and in conformance