Laserfiche WebLink
ATTY/RESO.0099/PC RESO FOR 1417 MIDDLEFIELD RD <br />REV: 11-12-2021 JB <br />Page 9 of 16 <br />Fees The following fees must be paid in full prior to issuance of the building permit for the future duplex unless otherwise described below. All fees are estimates. 5. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting from the proposed project, estimated at $3,234.00. [SDR] [ENGINEERING] 6. Parks Impact Fee – Pay a Parks Impact Fee for the net new dwelling units resulting from the proposed project, estimated at $45,495.81 (additional unit to existing structure, and p duplex development on the new parcel). [SDR][PARKS] 7. School Impact Fee – For residential additions greater than 500 square feet and new commercial or industrial construction, pay a School Impact Fee to the Sequoia Union High School District. Information regarding this fee may be obtained by contacting the Sequoia Union High School District at (650) 369-1411. [SDR][SCHOOL DISTRICT] 8. Water and Sewer Fees – Pay applicable water, recycled water, and wastewater-related fees as outlined on the City’s website. [SDR][ENGINEERING] 9. Notice of Fees Protest – The applicant may protest any fees, dedications, reservations, or other exactions imposed by the City as part of the approval or as a condition of approval of this development. Per California Government Code Section 66020, this 90-day protest period has begun as of the date of the approval of this application. [SDR][OFFICE OF THE CITY ATTORNEY] Landscaping and Site Improvements 10. Water-Efficient Landscaping – Provide a landscaping and irrigation plan conforming to the California Water-Efficient Landscape Ordinance (AB 1881), including an automatic irrigation system (drip, micro-spray, or bubblers) with a rain sensor, and show these measures on the building permit plans. [COA][PLANNING] 11. Tree Survey - Provide a tree survey that identifies type, diameter at breast height (DBH), condition and location prior to building permit issuance. [COA][PLANNING] 12. Tree Protection - Provide tree protection measures for ordinance-sized trees near the project and show these measures on the building permit plans. [COA][PLANNING] 13. Tree Removal Permit - Obtain a Tree Removal Permit for the removal and tree trimming of all ordinance-size trees (number, type and location) defined within the City’s Tree Preservation Ordinance prior to building permit issuance. [SDR][PLANNING]