My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC22-06 0079 PC Reso Recommending Certification of the SEIR
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2022
>
Reso PC22-06 0079 PC Reso Recommending Certification of the SEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:31:33 AM
Creation date
7/31/2024 11:31:03 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
10/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Mitigation Monitoring and Reporting Program <br /> <br />TABLE 4-1 (CONTINUED) <br />TRANSIT DISTRICT DTPP AMENDMENTS MITIGATION MONITORING AND REPORTING PROGRAM <br />Redwood City Transit District DTPP Amendments 4-9 ESA / 202100421.00 <br />Final EIR October 2022 <br />MITIGATION MEASURES <br />Monitoring Program <br />Implementation <br />Responsibility <br />Monitoring and <br />Reporting Action <br />Monitoring <br />Responsibility <br />Monitoring <br />Schedule <br />Air Quality (cont’d.) <br />Mitigation Measure AQ-2a (cont’d.) <br /> All vehicle speeds on unpaved roads shall be limited to 15 mph. <br /> All roadways, driveways, and sidewalks to be paved shall be completed as soon <br />as possible. Building pads shall be laid as soon as possible after grading unless <br />seeding or soil binders are used. <br /> Idling times shall be minimized either by shutting equipment off when not in use <br />or reducing the maximum idling time to 5 minutes (as required by the California <br />airborne toxics control measure Title 13, Section 2485 of California Code of <br />Regulations [CCR]). Clear signage shall be provided for construction workers at <br />all access points. <br /> All construction equipment shall be maintained and properly tuned in accordance <br />with manufacturer’s specifications. All equipment shall be checked by a certified <br />mechanic and determined to be running in proper condition prior to operation. <br /> Post a publicly visible sign with the telephone number and person to contact at <br />the Lead Agency regarding dust complaints. This person shall respond and take <br />corrective action within 48 hours. The BAAQMD’s phone number shall also be <br />visible to ensure compliance with applicable regulations. <br /> 3. 3. <br />Mitigation Measure AQ-2b: Emission Reduction Measures for Projects <br />Exceeding the Significance Thresholds for Criteria Pollutants. <br />Project applicants proposing projects that exceed BAAQMD screening levels shall <br />prepare a project-level criteria air pollutant assessment of construction and <br />operational emissions at the time the project is proposed. The project-level <br />assessment shall either include a comparison of the project with other similar <br />projects where a quantitative analysis has been conducted, or shall provide a <br />project-specific criteria air pollutant analysis to determine whether the project <br />exceeds the BAAQMD’s criteria air pollutant thresholds. <br />In the event that a project-specific analysis finds that the project could result in <br />criteria air pollutant emissions that exceed BAAQMD significance thresholds, the <br />project applicant shall implement the following emission reduction measures to the <br />degree necessary to reduce the impact to less than the significance thresholds, and <br />shall implement additional feasible measures if necessary to reduce the impact to <br />less than the significance thresholds. <br />Clean Construction Equipment <br />1. The project applicant shall use electric construction equipment when feasible. <br /> <br />Project Applicant, <br />construction <br />contractor(s) <br /> <br />1. Prepare project- <br />level criteria air <br />pollutant <br />assessment of <br />construction and <br />operational <br />emissions <br />2. Implement <br />emission reduction <br />measures <br /> <br />1. City <br /> <br /> <br /> <br /> <br /> <br /> <br />2. City <br /> <br />1. When the project <br />is proposed <br /> <br /> <br /> <br /> <br /> <br />2. During <br />construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.