ATTY/RESO.0083/PC RESO RECOMMENDING GENERAL PLAN AMENDMENT APPROVAL – HARBOR VIEW PROJECT – EXHIBIT D
<br />REV: 11-02-2022 VR
<br />Page 15 of 16
<br />General Requirements 81. Code Edition - This project shall be designed to meet the applicable California Building
<br />Standards Code that is in effect at the time of building permit application. CBC 1.1.9.
<br />[COA][BUILDING] 82. Infrastructure Improvements- All infrastructure shown on the project plans, inclusive of,
<br />but not but limited to the water main along the property frontage shall be installed.
<br />[COA][ENGINEERING] 83. All-Electrical Building - Project shall comply with the requirements of the City of Redwood
<br />City Ordinance No. 2487 for all electric building standards or the exceptions.
<br />[COA][BUILDING] 84. Exterior Materials – The exterior materials, colors, textures, trim elements, windows and
<br />roof pitch of the project shall be consistent throughout and substantially conform to the
<br />colors and materials board, date received April 29, 2022, on file with Planning Services.
<br />[COA][PLANNING] 85. Modifications - Modifications to the approved plans require Planning review and approval
<br />prior to building permit issuance. Minor project modifications required to meet building,
<br />fire, and safety codes at time of building permit plan check may be allowed, at the City’s
<br />discretion. Substantial modification of approved plans, as determined by the Zoning
<br />Administrator, may be subject to an amendment or a new Permit. [COA][PLANNING] 86. Art in Public Places – Applicant shall contribute one percent of the construction value to
<br />the Art in Public Places Fund or provide art of equal value on site as approved by City.
<br />[COA][PARKS] 87. Indemnification – Per Redwood City Code Section 1.54, Applicant shall defend (with
<br />counsel approved by City), indemnify, and hold harmless the City, its agents, officers, and
<br />employees from and against any claim, action, or proceeding (including without limitation
<br />any appeal or petition for review thereof) against the City or its agents, officers or
<br />employees related to an approval of the Project, including without limitation any related
<br />application, permit, certification, condition, environmental determination, other approval,
<br />compliance or failure to comply with applicable laws and regulations, and/or processing
<br />methods (“Challenge”). City may (but is not obligated to) defend such Challenge as City, in
<br />its sole discretion, determines appropriate, all at applicant’s sole cost and expense.
<br />Applicant shall bear any and all losses, damages, injuries, liabilities, costs, and expenses
<br />(including, without limitation, staff time and in-house attorney's fees on a fully-loaded
<br />basis, attorney’s fees for outside legal counsel, expert witness fees, court costs, and other
<br />litigation expenses) arising out of or related to any Challenge (“Costs”), whether incurred
<br />by Applicant, City, or awarded to any third party, and shall pay to the City upon demand
<br />any Costs incurred by the City. No modification of the project, any application, permit,
<br />certification, condition, environmental determination, other approval, change in applicable
|