Laserfiche WebLink
ATTY/RESO.0114/PC RESO CERTIFYING FINAL EIR – 557 E. BAYSHORE ROAD <br />REV: 12-09-22 VR <br />Page 24 of 61 <br />Transportation and Traffic Impacts TRN-2: The Project could conflict or be <br />inconsistent with CEQA Guidelines Section 15064.3, subdivision (b). <br />Transportation and Traffic Impacts TRN-C: The Project could result in a cumulatively <br />considerable contribution to a significant transportation impact. <br />The primary purpose of an EIR’s alternative analysis is to identify and evaluate possible <br />alternatives to the Project that can avoid or substantially lessen the Project’s significant <br />environmental effects while still achieving the basic objectives of the Project. The applicant <br />determined the following to be their objectives for the Project (see DEIR page 14): <br /> <br /> Redevelop the 14.36-acre site to allow for the creation of a mixed-use waterfront project. <br /> Construct up to 480 residential units including 85 below market rate in two buildings <br /> Construct a commercial use fitness center with up to 97,101 square feet of indoor uses <br />and 51,209 square feet of outdoor uses. <br /> Provide pedestrian and bicycle circulation around and through the site. <br /> Enhance public connectivity to the Bay Trail as neighboring properties develop by <br />providing a new walkway. <br /> <br />The City of Redwood City has developed the following project objectives: <br /> <br /> Meet the City s strategic priority to increase housing supply (480 units) and affordable <br />rental housing (85 BMR units) <br /> Create an attractive link and gateway to the bayfront area as intended by the General Plan <br />designation for the area. <br /> Allow for a mixed-use redevelopment of an underutilized commercial site within a <br />transitional neighborhood of more walkable and residential uses. <br /> Ensure development accounts for climate change, sea level rise and complies with BCDC <br />requirements. <br /> Provide public access along water edges, to public open spaces and trails, and to vista <br />points as integral parts of neighborhood development. <br /> <br />Findings Relating to Alternatives <br /> <br />Based on the evaluation and analysis of Project Alternatives set forth in Section 7.4 of the DEIR <br />(pgs. 217 through 221), and on the entire record of proceedings for the Project, the Planning <br />Commission hereby makes the following findings: <br />Findings Relating to Residential Development Only Alternative. <br />The Residential Development Only Alternative would eliminate the commercial use, and just <br />provide housing. This alternative would eliminate Impact TRN-2 which identifies a significant <br />VMT impact associated with the proposed fitness center. Unless the amount of construction <br />required for this alternative is less than required for the proposed project, the significant NOx <br />emissions identified in Impact AIR-2 would still occur. The mitigation measures required to bring <br />Impact BIO-1 and Impact BIO-2 to a less than significant level are not due to the proposed land <br />uses of the project, but are rather due to the location and construction of the proposed development.