Laserfiche WebLink
ATTY/RESO.0114/PC RESO CERTIFYING FINAL EIR – 557 E. BAYSHORE ROAD <br />REV: 12-09-22 VR <br />Page 29 of 61 <br />P R E F A C E <br /> <br />Section 21081.6 of the California Environmental Quality Act (CEQA) requires a Lead Agency to <br />adopt a Mitigation Monitoring or Reporting Program (MMRP) whenever it approves a project for <br />which measures have been required to mitigate or avoid significant effects on the environment. <br />The purpose of the monitoring and reporting program is to ensure compliance with the mitigation <br />measures during project implementation. <br /> <br />The Environmental Impact Report (EIR) prepared for the 557 East Bayshore Road Project <br />concluded that the implementation of the project could result in significant effects on the <br />environment and mitigation measures were incorporated into the proposed project. This MMRP <br />addresses those measures in terms of how and when they will be implemented. <br /> <br />This document does not discuss those subjects for which the EIR concluded that the impacts from <br />implementation of the project would be less than significant. Project conditions identified in the <br />EIR are listed at the end of the MMRP. <br /> <br />I, , the applicant, on the behalf of , <br />hereby agree to fully implement the mitigation measures described below which have been <br />developed in conjunction with the preparation of an EIR for my proposed project. I understand <br />that these mitigation measures or substantially similar measures are required of my project to <br />avoid or reduce potential significant environmental impacts. <br /> <br /> <br />Project Applicant’s Signature _____________________________________________ <br /> <br />Date___________________________________________________________ <br />